Helpdesk Customers must contact LightEdge Support to report service trouble or an outage with LightEdge Technical Support. LightEdge Technical Support will be available seven (7) days per week; twenty-four (24) hours per day; three hundred sixty-five days (365) days per year. LightEdge Technical Support provides support for network monitoring, trouble ticket resolution, and fault isolation up to the termination point of LightEdge provided Equipment. LightEdge Technical Support will accept trouble and outage related support calls from any customer representative. LightEdge will not perform any requested activity which may cause Service disruption or perform any changes to Service unless request is initiated by an Authorized Contact. LightEdge reserves the right to delay response on support tickets opened by anyone other than the Authorized Contact. Communication between Customer and LightEdge not initiated by Authorized Contact will not be subject to SLA remedies. All communications with Customer will be in the English language.
Synchronization The Licensor hereby grants limited synchronization rights for One (1) music video streamed online (Youtube, Vimeo, etc..) for up to 500,000 non-monetized video streams on all total sites. A separate synchronisation license will need to be purchased for distribution of video to Television, Film or Video game.
Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Message Screening 7.4.4.4.1 BellSouth shall set message screening parameters so as to accept valid messages from MRC local or tandem switching systems destined to any signaling point within BellSouth’s SS7 network where the MRC switching system has a valid signaling relationship. 7.4.4.4.2 BellSouth shall set message screening parameters so as to pass valid messages from MRC local or tandem switching systems destined to any signaling point or network accessed through BellSouth’s SS7 network where the MRC switching system has a valid signaling relationship. 7.4.4.4.3 BellSouth shall set message screening parameters so as to accept and pass/send valid messages destined to and from MRC from any signaling point or network interconnected through BellSouth’s SS7 network where the MRC SCP has a valid signaling relationship.
Scoring The number of routes each company operates (Route # 0001-2999, 8000-8199) will be multiplied by 2 to determine the daily number of trips. (Only accidents, breakdowns and service reports related to routes falling in this range will be used for the evaluation). The daily number of trips will be multiplied by 175 to arrive at the annual number of trips. The number of accidents, breakdowns and service complaints will be divided by the total number of trips to calculate a percent figure. Each company’s percentage will be compared to the total average. See below for a sample. BUS COMPANY NUMBER OF TOTAL BKDN PERCENT ACCIDENTS PERCENT2 SERVICE PERCENT3 ROUTES TRIPS BKDN ACCIDENTS REPORTS COMPLAINTS TO TRIPS TO TRIPS TO TRIPS A 360 58680 3 0.01% 27 0.05% 46 0.08% B 48 7824 3 0.04% 4 0.05% 39 0.50% C 123 20049 11 0.05% 9 0.04% 27 0.13% D 91 14833 0.00% 10 0.07% 11 0.07% E 124 20212 20 0.10% 19 0.09% 18 0.09% TOTALS 746 121598 37 0.03% 69 0.06% 141 0.12% To score, if a company’s percentage is less than or equal to the total percentage for that category, the company will be awarded 6 points per category. Percentages greater than the total percentage for each distinct category (Accident, Breakdown, Service Complaints) will be scored according to the following scale: Less than-Equal to Ave. 6 points 0-3% above average 5 points 4-7% above average 4 points 5-8% above average 3 points 9-12% above average 2 points 13-16% 1 points Greater than 17% 0 points Any circumstance whereby a Breakdown or Accident is found by PTS to be ‘Non Reported’ by vendor within the required timeframe (see G-36) will count as (20) ‘Reported’ instances for the purpose of this Contractor Evaluation Scoring.
Year 2000 Compatibility Take all action necessary to assure that its computer based systems are able to operate and effectively process data including dates on and after January 1, 2000, and, at the reasonable request of the Administrative Agent or the Required Lenders, provide evidence to the Lenders of such year 2000 compatibility.
System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2
Interface A defined set of transmission facilities that separate Load Zones and that separate the NYCA from adjacent Control Areas. Investor-Owned Transmission Owners. A Transmission Owner that is owned by private investors. At the present time these include: Central Xxxxxx Gas & Electric Corporation, Consolidated Edison Company of New York, Inc., New York State Electric & Gas Corporation, Niagara Mohawk Power Corporation, Orange and Rockland Utilities, Inc., and Rochester Gas and Electric Corporation.
Network Upgrades The Transmission Owner shall design, procure, construct, install, and own the Network Upgrades described in Attachment 6 of this Agreement. If the Transmission Owner and the Interconnection Customer agree, the Interconnection Customer may construct Network Upgrades that are located on land owned by the Interconnection Customer. Unless the Transmission Owner elects to pay for Network Upgrades, the actual cost of the Network Upgrades, including overheads, shall be borne initially by the Interconnection Customer.