Land Drains Sample Clauses

Land Drains. Land drain laterals which meet the existing requirements of the city standards shall be cut back to a point ten (10) feet inside the property line, an approved plug shall be placed in the lateral, and a 2” x 4” piece of treated lumber shall be placed at the end of the pipe and extended up to within one foot of final grade. Laterals which do not meet the requirements of the city standards shall be removed back to the land drain main and the main repaired to meet the requirements of the Clinton City Public Works Department, or the lateral is to be permanently plugged with concrete by a means approved by public works.
AutoNDA by SimpleDocs

Related to Land Drains

  • Land The real property described in Exhibit A attached hereto and made a part hereof (the “Land”);

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Land Use The current use and occupancy of the Property for hotel purposes are permitted as a matter of right as a principal use under all laws applicable thereto without the necessity of any special use permit, special exception or other special permit, permission or consent.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Porcupine Site Highway 11 and the City of Timmins Thunder Bay and District Toronto/York-Peel

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following: A. Company is required to submit a Notice of Intent to use the State of Florida Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity. Authority and Company both acknowledge that close cooperation is necessary to ensure compliance with any stormwater discharge permit terms and conditions, as well as to ensure safety and to minimize the cost of compliance. Company acknowledges further that it may be necessary to undertake actions to minimize the exposure of stormwater to “significant materials” (as such term may be defined by applicable stormwater rules and regulations) generated, stored, handled, or otherwise used by Company by implementing and maintaining “best management practices” (BMPs) (as such term may be defined in applicable stormwater rules and regulations). Company will establish a BMP plan for the Premises and submit a copy to Authority. B. Company will be knowledgeable of any stormwater discharge permit requirements applicable to Company and with which Company will be obligated to comply. The submittal of a Notice of Intent will be made by Company to the FDEP, and a copy will be submitted to Authority. Company is required to comply with the following requirements including, but not limited to, certification of non-stormwater discharges; collection of stormwater samples; preparation of a Stormwater Pollution Prevention Plan or similar plans; implementation of BMPs; and maintenance and submittal of necessary records. In complying with such requirements, Company will observe applicable deadlines set by the regulatory agency that has jurisdiction over the permit. Company agrees to undertake, at its sole expense, those stormwater permit requirements for which it has received written notice from the regulatory agency and that apply to the Premises, and Company agrees that it will hold harmless and indemnify Authority for any violations or non-compliance with any such permit requirements.

  • Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.

  • Platby In consideration for the proper performance of the Study by Site in compliance with the terms and conditions of this Agreement, payments shall be made in accordance with the provisions set forth in Attachment A, with the last payment being made after the Site completes all its obligations hereunder, and IQVIA has received all properly completed CRFs and, if IQVIA requests, all other Confidential Information (as defined below). V souvislosti s řádným plněním Studie Místem provádění klinického hodnocení, a to v souladu s podmínkami a ustanoveními této Smlouvy, budou poskytovány platby dle podmínek a ustanovení definovaných v Příloze A, přičemž poslední platba bude uskutečněna poté, co Místo provádění klinického hodnocení splní a dokončí veškeré závazky, jež mu vyplývají z této Smlouvy, a IQVIA obdrží veškeré řádně vyplněné CRF a, bude-li tak IQVIA vyžadovat, veškeré další Důvěrné informace The estimated value of financial payment under this Agreement shall be approximately CZK 903.042,-. DrugDev will receive Site invoices and process payments unless otherwise agreed. Any queries regarding Site invoices or payments should be directed to XxxxXxx at the contact details outlined in Attachment A. All payments will be made in favor of the Institution. (ve smyslu níže uvedené definice). Předpokládaná hodnota finančního plnění dle této Smlouvy činí přibližně 903.042,- Kč. Nebude-li ujednáno jinak, faktury od Místa provádění klinického hodnocení obdrží a platby bude zpracovávat společnost DrugDev. Veškeré dotazy ohledně faktur Místa provádění klinického hodnocení nebo plateb mají být adresovány společnosti DrugDev, jejíž kontaktní údaje jsou uvedeny v Příloze A. Veškeré platby budou uskutečněny ve prospěch Poskytovatele...

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!