Load Capacity Sample Clauses

Load Capacity. The floor load capacity is 350 pounds per square foot. Height Limits. Unless otherwise restricted or controlled by the Convention Center, the height limit of booths is 8 feet for inline and peninsula booths and 20 feet for island booths. Booths, equipment or displays rising above the provided booth drape must supply, at Exhibitor’s expense, appropriate draping to cover any unfinished area of the display. No signs may be suspended above the height limit without prior written consent from ISRI. No canopies and/or ceilings are permitted without the prior written consent of ISRI. The top of such overhead structures may be no higher than 20 feet. No enclosures or enclosed ceilings may be in excess of 100 square feet. Hanging Signs. Hanging signs are permitted over island and peninsula booths only. Back and Sides of Exhibit Space. Where applicable, ISRI will provide Exhibitor with an 8-foot high back drape and 3-foot-high divider drapes between booth spaces.
AutoNDA by SimpleDocs
Load Capacity. 5.2.2.1. Subject to the provisions of paragraph 5.2.4. of this Regulation, the maximum load rating of every tyre as determined in paragraph 5.2.2.2. of this Regulation, including a standard spare unit (if provided), with which the vehicle is fitted shall be:
Load Capacity. A condition which results in a restriction of the maximum acceptable load carrying capacity of a structure to some value less than 27 Tons on the Type III, 3-axle truck at the Operating Rating level.
Load Capacity a. A condition which results in a restriction of the maximum acceptable load carrying capacity of a structure to a value less than 3 Tons at the operating level.
Load Capacity. Subject to load ability and operational restrictions, the maximum load capacity available for the above will be based on the flight schedule as per Article 1d.
Load Capacity. 8.1 Measures are in place to ensure the ability to ensure the resilience of the systems and services in connection with long term processing.☐ no☐ yes please enter the measures. Recoverability

Related to Load Capacity

  • Contract Capacity The capacity of the Project at any time shall be the lower of the following: (A) the contract capacity in MW designated in the Cover Sheet or (B) the Net Rated Output Capacity of the Project (the “Contract Capacity”). Throughout the Delivery Term, Seller shall sell all Product produced by the Project solely to Buyer. In no event shall Buyer be obligated to receive, in any Settlement Interval, any Surplus Delivered Energy. Seller shall not receive payment for any Surplus Delivered Energy. To the extent Seller delivers Surplus Delivered Energy to the Delivery Point in a Settlement Interval in which the Real-Time Price for the applicable PNode is negative, Seller shall pay Buyer an amount equal to the Surplus Delivered Energy (in MWh) during such Settlement Interval, multiplied by the absolute value of the Real-Time Price per MWh for such Settlement Interval.

  • Acting Capacity When an employee is assigned temporarily to a job for which he/she is qualified in a higher pay grade for a period of five (5) days or his/her regular workweek, whichever is less, the employee shall be paid retroactively from the initial date of the temporary transfer for the duration of the temporary assignment. The employee shall be paid as if he/she had been promoted during such assignment. In no event may an employee acquire any status in a higher classification as a result of his/her temporary assignment. Acting capacity assignments shall not be made on an arbitrary or capricious basis. Employees shall not be rotated in acting capacity in an arbitrary or capricious manner in order to avoid payment of acting capacity pay. This Article shall not be used in lieu of the proper processing of any request for reclassification or reallocation of a position pursuant to Article 48, Reclassifications, or the filling of a vacancy pursuant to Article 56, Seniority.

  • Maximum Capacity The Sick Leave Bank shall accumulate unused Bank days from year to year to a maximum capacity which shall not exceed double the number of eligible employees as defined in the above Section C, Eligibility for Membership.

  • FREQUENCY AND CAPACITY LEVELS No restriction on frequency, capacity or aircraft type.

  • INDEPENDENT CAPACITY The employees or agents of each party who are engaged in the performance of this Agreement shall continue to be employees or agents of that party and shall not be considered for any purpose to be employees or agents of the other party.

  • Legal Capacity All parties to the Mortgage Note and the Mortgage had legal capacity to enter into the Mortgage Loan and to execute and deliver the Mortgage Note and the Mortgage, and the Mortgage Note and the Mortgage have been duly and properly executed by such parties. The Mortgagor is a natural person;

  • Authority and Capacity Contractor and Contractor’s signatory each warrant and represent that each has full authority and capacity to enter into this Contract.

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process.

Time is Money Join Law Insider Premium to draft better contracts faster.