Maintenance of Load Control Equipment Sample Clauses

Maintenance of Load Control Equipment. A party providing Load Control Equipment will endeavour in accordance with Good Electricity Industry Practice to ensure that the Load Control Equipment:
AutoNDA by SimpleDocs
Maintenance of Load Control Equipment. This clause 5.7 applies until such time as the Code expressly provides for the maintenance of Load Control Equipment, or until such time that the Distributor no longer utilises Load Control Equipment. A party providing Load Control Equipment must endeavour in accordance with Good Electricity Industry Practice to ensure that the Load Control Equipment:

Related to Maintenance of Load Control Equipment

  • Maintenance of Equipment The Equipment shall be maintained in good operating condition and repair (reasonable wear and tear excepted) and all necessary replacements of and repairs thereto shall be made so that the value and operating efficiency of the Equipment shall be maintained and preserved. No Borrower shall use or operate the Equipment in violation of any law, statute, ordinance, code, rule or regulation. Each Borrower shall have the right to sell Equipment to the extent set forth in Section 4.3 hereof.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

Time is Money Join Law Insider Premium to draft better contracts faster.