Maximum Height. Twenty-five (25) feet; except that such height limitation shall, where applicable, be increased or reduced in accord with the height bonus provisions, airport restrictions, and other regulations contained in chapter 136, section 136.004. (6)
Maximum Height. No Dwelling in the Development shall exceed two stories in height; provided, that for purposes of this Section 3.06, a Dwelling’s basement shall not be considered as one of the Dwelling’s stories.
Maximum Height. Crown Communication shall extend the height of the tower by thirty-nine (39) feet, but shall not further increase the height of the Tower in the future.
Maximum Height. The allowable height for any vessel transiting the Canal or entering the Port of Balboa is 57.91 meters (190 feet) at any state of the tide, measured from the waterline to the highest point. Height may be permitted to 62.48 meters (205 feet), subject to approval of the Authority on a case-by-case basis, with passage at low water (MLWS) beneath the bridge at Balboa.
Maximum Height. (i) Fill shall not exceed 1200 mm from the natural ground level of the Allotment.
Maximum Height. (a) The maximum height of fences must be in compliance with local authority guidelines.
Maximum Height a. The allowable height for any vessel transiting the Canal or entering any Canal port terminals is 57.91 meters (189.94 feet) at any state of the tide, measured from the waterline to the highest point of the structure. Heights exceeding 57.91 meters (189.94 feet) shall be subject to prior approval of the Authority on a case by case basis.
Maximum Height. The maximum height of a roof mounted antenna shall be eighteen feet (18') above the roof line of the building.
Maximum Height. The maximum height of a stealth facility shall be the maximum structure height of the zoning district in which the stealth facility is located. The applicant may exceed the maximum structure height if allowed pursuant to a conditional use permit. 10a-14 Conditional Use Permit Considerations. In addition to the City’s standard conditional use permit considerations, the Planning Commission shall consider the following factors when deciding whether to grant a conditional use permit for a personal wireless services facility:
Maximum Height. The District of Mission Zoning Bylaw regulates the maximum height of structures.