Mechanical Levee Construction Sample Clauses

Mechanical Levee Construction. The Specifications contained an “Order of Work” provision for “Retaining Levees,” see JX 2 (Specs.) at 100, ¶ 1.4.3, providing that all mechanical levee construction was to be “fully complete . . . prior to beginning work on placement of the Hydraulically Constructed Levees,” id. ¶ 1.4.3(1). This provision specified that the contractor was to construct a new drop-outlet structure17 at the northeast corner of Lost Lake, modify the existing drop-outlet structure at the northwest corner of Lost Lake, and mechanically construct the portions of the levee located on the south side of Lost Lake and near both Drop-Outlet structures prior to placing the hydraulically-constructed part of the new perimeter levee (hydraulic levee) on the west, east and north sides of Lost Lake. Id.; see also JX 5 (Drawings) at 14 nn.8–9. 16“New work [or “virgin”] material . . . [is] earth [taken from] . . . areas that have never been excavated before.” Tr. at 395:32–34 (Xxxxxx). New work material is excavated during “new work dredging,” defined as “the creation or alteration of an existing channel to a prescribed depth or width.” JX 98A (Xxxxxx Dep.) at 20:8–10. By contrast, “[m]aintenance dredging is the dredging of a channel that has previously been dredged to its authorized depth, and it’s being dredged again to remove material that has shoaled in since the time it was dredged.” Id. at 19:14–18; see also JX 103A (Xxxxx Dep.) at 43:1–5 (“Maintenance dredging is basically cleaning up an area that’s been dredged before. It’s not virgin dredging, so it would be removing silt and deposits that have happened after dredging has already taken place.”). 17The drop-outlet structures, also known as spill boxes, Tr. at 3198:24–3199:31 (XxXxxxxx), “control the discharge of fluids [that accumulated in Lost Lake] back into the . . . San Jacinto River,” id. at 500:19–20 (Xxxxxx). A drop-outlet structure contains a “mechanism .
AutoNDA by SimpleDocs

Related to Mechanical Levee Construction

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians.

  • Routine Maintenance, Construction, and Repair The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State Transmission System or Distribution System. The NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such interruption. The NYISO and Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • General construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Pre-Construction Phase Employer’s Liability, Workers’ Compensation, Comprehensive General Liability and Comprehensive Automobile Liability in the amounts as set forth in the UGSC.

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Commencement and Completion of Construction The Company shall begin Construction Activities no later than January 1, 2014 (“Commencement Date”) and secure a final Certificate of Compliance by June 30, 2015 (hereinafter, “Completion Date”).

Time is Money Join Law Insider Premium to draft better contracts faster.