Method of Measurement. Prices are to include for working concrete around pipes and electric conduits or cable, including provision for support of same while concrete is placed. The prices for insitu work are to include for filling into, or on to, formwork where necessary, and where concrete is described as reinforced for well tamping reinforcement. Unless otherwise described, all formwork and reinforcement are measured separately. Prices for precast concrete work; including items described as precast or insitu, shall include for all moulds, for hoisting and for placing in position, bedding, jointing or building in with cement mortar. All reinforcing bars are of round section unless otherwise stated and no allowance has, or will be, made for rolling margin. Prices for holes shall include for them being on rake where so required and shall include the necessary holes through formwork. The cost of all construction joints, as described herein and not specifically shown on the drawings and measured separately in this Document, shall be deemed to be included in the rates set against the other items in this Document. The cost of providing all samples described herein shall be deemed to be included in the contract sum. The cost of performing all tests described herein shall be deemed to be included in the contract sum except the net invoiced cost of testing items or samples at authorized testing laboratories as instructed by the Architect or Engineer, which costs will be reimbursed from the Provisional Sum included elsewhere in this document. Xxxxxx purchased for the fabrication of formwork will be regarded as construction plant and will not be paid for as materials on site. Specification Concrete Work (2/F/19) XXXXXXX
Appears in 10 contracts
Samples: Contract Agreement, Construction Contract, Construction Contract
Method of Measurement. Prices are to include for working concrete around pipes and electric conduits or cable, including provision for support of same while concrete is placed. The prices for insitu work are to include for filling into, or on to, formwork where necessary, and where concrete is described as reinforced for well tamping reinforcement. Unless otherwise described, all formwork and reinforcement are measured separately. Prices for precast concrete work; including items described as precast or insitu, shall include for all moulds, for hoisting and for placing in position, bedding, jointing or building in with cement mortar. All reinforcing bars are of round section unless otherwise stated and no allowance has, or will be, made for rolling margin. Prices for holes shall include for them being on rake where so required and shall include the necessary holes through formwork. The cost of all construction joints, as described herein and not specifically shown on the drawings and measured separately in this Document, shall be deemed to be included in the rates set against the other items in this Document. The cost of providing all samples described herein shall be deemed to be included in the contract sum. The cost of performing all tests described herein shall be deemed to be included in the contract sum except the net invoiced cost of testing items or samples at authorized testing laboratories as instructed by the Architect or Engineer, which costs will be reimbursed from the Provisional Sum included elsewhere in this document. Xxxxxx Timber purchased for the fabrication of formwork will be regarded as construction plant and will not be paid for as materials on site. Specification Concrete Work (2/F/19) XXXXXXX
Appears in 7 contracts
Samples: Contract for Rehabilitation Works, Contract Agreement, Construction Contract