Mobilization/De-Mobilization Sample Clauses

Mobilization/De-Mobilization. All employees assigned to work for more than one (1) month at a project farther than 500 kilometres from their primary residence are paid a mobilization payment of $100.00 at the beginning of their assignment at the project, and a demobilization payment of $100.00 when their assignment on that project ends.
AutoNDA by SimpleDocs
Mobilization/De-Mobilization. All employees assigned to work on a project are eligible to receive a mobilization payment of $100.00 at the beginning of their assignment at that project, and a demobilization payment of

Related to Mobilization/De-Mobilization

  • Mobilization Design-Builder shall mobilize, transport and assemble its equipment, materials, and supplies, as well as construct such temporary systems as are necessary and required at the Site, all in adequate time for satisfactory performance of the Work.

  • Utilization Management Contractor shall maintain a utilization management program that complies with applicable laws, rules and regulations, including Health and Safety Code § 1367.01 and other requirements established by the applicable State Regulators responsible for oversight of Contractor.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Construction Management Fee The Construction Management Fee for the Project shall be either a ☒Lump Sum or ☐Not-To-Exceed Fee of Thirteen Thousand, Six Hundred Thirty-Two Dollars ($13,632.00). NOTE: Allowances will be on a Not-To-Exceed basis. All unused funds will be returned to the School District at the time of construction closeout. Fee will be paid only on cost of work for these items.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Underutilization 4.6.3.2.1 Underutilization of Local Only Trunk Groups, Local Interconnection Trunk Groups, Third Party Trunk Group and Meet Point Trunk Groups exists when provisioned capacity is greater than the current need. Those situations where more capacity exists than actual usage requires will be handled in the following manner: 4.6.3.2.1.1 If a Local Only Trunk Group, Local Interconnection Trunk Group, Third Party Trunk Group or a Meet Point Trunk Group is under sixty-five percent (65%) of CCS capacity on a monthly average basis for AT&T- 12STATE or under eighty percent (80%) for AT&T SOUTHEAST REGION 9-STATE, for each month of any three (3) consecutive months period, either Party may request the issuance of an order to resize the Local Only Trunk Group, Local Interconnection Trunk Group, Third Party Trunk Group or the Meet Point Trunk Group, which shall be left with not less than twenty-five percent (25%) excess capacity for AT&T-12STATE or not less than fifteen percent (15%) for AT&T SOUTHEAST REGION 9-STATE. In all cases, grade of service objectives shall be maintained. 4.6.3.2.1.2 Either Party may send a TGSR to the other Party to trigger changes to the Local Only Trunk Groups, Local Interconnection Trunk Groups, Third Party Trunk Groups or Meet Point Trunk Groups based on capacity assessment. Upon receipt of a TGSR, the receiving Party will issue an ASR to the other Party within twenty (20) business days after receipt of the TGSR. 4.6.3.2.1.3 Upon review of the TGSR, if a Party does not agree with the resizing, the Parties will schedule a joint planning discussion within the twenty

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.