Modifications Or Replacement Of Additional Facilities. ‌ 10.1 Whenever 230kV Switchrack Additional Facilities and/or Transmission Line Additional Facilities are modified or replaced due to damage, equipment failure or betterment, the work will be completed at SCE's expense. Except as otherwise provided in Section 10.2, if such modification or replacement results in a change in the 230kV Switchrack Additional Facilities and/or Transmission Line Additional Facilities investment, the 230kV Switchrack Additional Facilities and/or Transmission Line Additional Facilities Cost shall be adjusted on the basis of the revised net investment effective as of the operation date of such modification or replacement. EDE shall pay SCE for any additional one-time costs (costs not includible in the 230kV Switchrack Additional Facilities and/or the Transmission Line Additional Facilities Cost) associated with such modification or replacement. 10.2 In the event that any modification or replacement of the 230kV Switchrack Additional Facilities and/or the Transmission Line Additional Facilities is performed in order to accommodate SCE's needs and not to maintain or to improve service to EDE, or because of damage caused by gross negligence or willful misconduct of SCE, no increase will be made to the 230kV Switchrack Additional Facilities and/or the Transmission Line Additional Facilities Charge and no costs shall be charged to EDE for such modification or replacement.
AutoNDA by SimpleDocs

Related to Modifications Or Replacement Of Additional Facilities

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Alterations, Modifications and Additions Company will, or will cause a Permitted Lessee to, make (or cause to be made) such alterations and modifications in and additions to the Airframe and the Engines as are required from time to time to meet the applicable requirements of the FAA or any applicable government of any other jurisdiction in which the Aircraft is then registered; except for (i) immaterial and non-recurring violations with respect to which corrective measures are being taken promptly by Company (or, if a Lease is then in effect, any Permitted Lessee) upon discovery thereof and (ii) any law, rule, regulation or order the validity or application of which is being contested in good faith by Company (or, if a Lease is then in effect, any Permitted Lessee) in any manner which does not involve any material risk of sale, loss or forfeiture of the Aircraft and does not materially adversely affect Loan Trustee’s interest in the Aircraft. In addition, Company (or any Permitted Lessee), at its own expense, may from time to time add further parts or accessories and make or cause to be made such alterations and modifications in and additions to the Airframe or any Engine as Company (or any Permitted Lessee) deems desirable in the proper conduct of its business, including, without limitation, removal (without replacement) of Parts; provided that no such alteration, modification or addition shall materially diminish the value or utility of the Airframe or such Engine below its value or utility immediately prior to such alteration, modification or addition, assuming that the Airframe or such Engine was then in the condition required to be maintained by the terms of this Indenture, except that the value (but not the utility) of the Airframe or any Engine may be reduced by the value of any such Parts that are removed that Company (or such Permitted Lessee) deems obsolete or no longer suitable or appropriate for use on the Airframe or any Engine. For the avoidance of doubt, Company may make alterations in the passenger configuration of the Aircraft and such alterations shall not be subject to the immediately preceding sentence. All Parts incorporated or installed in or attached or added to the Airframe or any Engine as the result of such alteration, modification or addition shall, without further act, be subject to the Lien of this Indenture. Notwithstanding the foregoing, Company (or any Permitted Lessee) may, at any time, remove any Part from the Airframe or any Engine if such Part: (i) is in addition to, and not in replacement of or substitution for, any Part originally incorporated or installed in or attached to the Airframe or such Engine at the time of delivery thereof to Company or any Part in replacement of, or substitution for, any such Part, (ii) is not required to be incorporated or installed in or attached or added to the Airframe or such Engine pursuant to the first sentence of this Section 7.04(c) and (iii) can be removed from the Airframe or such Engine without materially diminishing the value or utility required to be maintained by the terms of this Indenture that the Airframe or such Engine would have had had such Part never been installed on the Airframe or such Engine. Upon the removal by Company (or any Permitted Lessee) of any Part as permitted by this Section 7.04(c), such removed Part shall, without further act, be free and clear of all rights and interests of Loan Trustee and the Lien of this Indenture and shall no longer be deemed a Part hereunder. Upon request of Company from time to time, Loan Trustee shall execute and deliver to Company instruments reasonably requested by Company confirming the release of any such removed Part from the Lien of this Indenture. Loan Trustee acknowledges that it has no interest in the Excluded Equipment. Notwithstanding the provisions of this Section 7.04(c) or any other term or condition of this Indenture, Company (or any Permitted Lessee) may from time to time install on, and remove from, the Aircraft equipment that is owned by, leased to or conditionally sold to Company (or any Permitted Lessee) (and title to such equipment shall remain vested in Company, such Permitted Lessee, or the lessor or the conditional vendor thereof) if (1) such equipment is Excluded Equipment and (2) the location affected by any such removal, if damaged, is repaired prior to return, in a workmanlike manner, to a condition suitable for commercial passenger service; provided that all costs of installation, removal and replacement shall be the responsibility of Company.

  • MAINTENANCE, REPAIRS, OR ALTERATIONS The Tenant shall, at their own expense and at all times, maintain premises in a clean and sanitary manner, and shall surrender the same at termination hereof, in as good condition as received, normal wear and tear excepted. The Tenant may not make any alterations to the leased premises without the consent in writing of the Landlord. The Landlord shall be responsible for repairs to the interior and exterior of the building. If the Premises includes a washer, dryer, freezer, dehumidifier unit and/or air conditioning unit, the Landlord makes no warranty as to the repair or replacement of units if one or all shall fail to operate. The Landlord will place fresh batteries in all battery-operated smoke detectors when the Tenant moves into the premises. After the initial placement of the fresh batteries it is the responsibility of the Tenant to replace batteries when needed. A monthly "cursory" inspection may be required for all fire extinguishers to make sure they are fully charged.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

  • Construction With Other Parts Of The Tariff This ISA shall not be construed as an application for service under Part II or Part III of the Tariff.

  • CONSTRUCTION AND RENOVATION Construction and renovation projects for a state, local, territorial, or Tribal government’s principal Emergency Operations Center (EOC) as defined by the State Administrative Agency are allowable under the EMPG Program. Written approval must be provided by FEMA prior to the use of any EMPG Program funds for construction or renovation. Requests for EMPG Program funds for construction of an EOC must be accompanied by an EOC Investment Justification (located in the Related Documents tab of the EMPG xxxxxx.xxx posting) to their Regional EMPG Manager for review. Additionally, recipients are required to submit a SF-424C Form and Budget detail citing the project costs. When applying for funds to construct communication towers Sub-Recipients must submit evidence that the Federal Communication Commission’s (FCC) Section 106 review process has been completed and submit all documentation resulting from that review to Grants Program Directorate (GPD) prior to submitting materials for EHP review. Sub-Recipients are also encouraged to have completed as many steps as possible for a successful EHP review in support of their proposal for funding (e.g., coordination with their State Historic Preservation Office to identify potential historic preservation issues and to discuss the potential for project effects, compliance with all state and EHP laws and requirements). Projects for which the Sub-Recipient believes an Environmental Assessment (EA) may be needed, as defined in as defined in DHS Instruction Manual 023-01-001-01, Revision 01, FEMA Directive 108-1 and FEMA Instruction 108-1-1, must also be identified to the FEMA EMPG Regional Program Manager within six months of the award, and completed EHP review materials must be submitted no later than 12 months before the end of the period of performance. EHP review packets should be sent to xxxxxxxxxx@xxxx.xxx. EMPG Program Sub-Recipients using funds for construction projects must comply with the Xxxxx-Xxxxx Act (40 U.S.C. §§ 3141 et seq.). Grant Sub-Recipients must ensure that their contractors or subcontractors for construction projects pay workers no less than the prevailing wages for laborers and mechanics employed on projects of a character similar to the contract work in the civil subdivision of the state in which the work is to be performed. Additional information regarding compliance with the Xxxxx- Xxxxx Act, including Department of Labor (DOL) wage determinations, is available from the following website: xxxxx://xxx.xxx.xxx/whd/govcontracts/dbra.htm In general, Sub-Recipients should consult with their Grant Manager prior to making any investment that does not clearly meet the allowable expense criteria established in this Guidance.

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • Alterations and Amendments This Agreement, applicable fees and service charges may be altered or amended from time-to-time. In such event, we will provide notice to you. Any use of the Service after we provide you a notice of change will constitute your agreement to such change(s). Further, we may, from time to time, revise or update the applications, services, and/or related material, which may render all such prior versions obsolete. Consequently, we reserve the right to terminate this Agreement as to all such prior versions of the applications, services, and/or related material and limit access to only the Service's more recent revisions and updates.

  • Construction of Agreement The parties mutually acknowledge that they and their attorneys have participated in the preparation and negotiation of this Agreement. In cases of uncertainty this Agreement shall be construed without regard to which of the parties caused the uncertainty to exist.