Natural Gas Sparging Meters Sample Clauses

Natural Gas Sparging Meters. Haverhill shall maintain, repair, calibrate and, as applicable, replace, at its sole cost and expense, the Natural Gas Sparging Meters required to maintain accurate measurements of the Natural Gas used for Sparging. The Natural Gas Sparging Meters shall be calibrated (i) at the frequency recommended by its manufacturer or, if no manufacturer’s recommendation exists, at the frequency established by Prudent Coke Plant Practice; and (ii) in any event not less than once per calendar year. Haverhill will inform Sunoco no less than twenty-four (24) hours prior to the commencement of each such calibration so that Sunoco Representatives may witness such calibration. If upon being calibrated, any of the Natural Gas Sparging Meters are found to be inaccurate or to be in error, such Natural Gas Sparging Meter shall be promptly adjusted to record measurements correctly. If a Natural Gas Sparging Meter is found to be inaccurate upon such calibration or testing by an amount exceeding two percent (2%), any previous recordings by such Natural Gas Sparging Meter shall be corrected according to the percentage of inaccuracy so found with the assumption that such inaccuracy began at a point in time midway between the testing or calibration date and the last previous date at which the equipment was tested or calibrated, unless there is a factual basis for a different time for beginning the period of inaccuracy. Absent Manifest Error, and subject to the foregoing, such measurements shall be binding and conclusive on the Parties.
AutoNDA by SimpleDocs

Related to Natural Gas Sparging Meters

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Fuel 28.1 The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 including GST per litre (which includes a service component).

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Mineral Reserves and Resources The estimated proven and probable mineral reserves disclosed in the Company SEC Documents as of December 31, 2015 have been prepared and disclosed in all material respects in accordance with all Applicable Laws. There has been no material reduction (other than as a result of operations in the ordinary course of business) in the aggregate amount of estimated mineral reserves and estimated mineral resources of the Company and its Subsidiaries, taken as a whole, from the amounts disclosed in such Company SEC Documents.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

Time is Money Join Law Insider Premium to draft better contracts faster.