Notification of Single System Projects Sample Clauses

Notification of Single System Projects. Each Planning Party shall advise ColumbiaGrid of any Single System Projects that it is planning on its Transmission System. If the system assessment performed by Staff under section 3 of this Appendix identifies a Need on a single Transmission System, Staff shall inform the subject XXXX of such Need and, if such XXXX concludes that such Need may be resolved on its Transmission System, the XXXX shall inform ColumbiaGrid of such resolution. In such instances, the Staff will include such Need in the Draft System Assessment Report for information purposes. If any Affected Person requests a Study Team to evaluate Material Adverse Impacts resulting from a potential Single System Project at a “section 3 meeting” to discuss the Draft System Assessment Report and Need Statements, ColumbiaGrid shall convene such a Study Team. The XXXX shall submit proposed Single System Projects to ColumbiaGrid. ColumbiaGrid shall inform the Planning Parties regarding any such Single System Project. If any Planning Party is concerned that such Single System Project will result in unmitigated Material Adverse Impacts, ColumbiaGrid shall convene a Study Team to evaluate whether there are unmitigated Material Adverse Impacts. If there are not unmitigated Material Adverse Impacts, ColumbiaGrid shall include such Single System Projects in the Plan for information purposes and include such Single System Project in future system assessments. If there are unmitigated Material Adverse Impacts, such Project is not a Single System Project and should be further developed through the ColumbiaGrid planning process as an EOP.
AutoNDA by SimpleDocs
Notification of Single System Projects. Each Planning Party shall advise ColumbiaGrid of any Single System Projects that it is planning on its Transmission System. Single System Projects may be for purposes of addressing a Need(s) or for another purpose. If the system assessment performed by Staff under section 3 of this Appendix identifies an EOP Need on a single Transmission System, Staff shall inform the subject XXXX of such EOP Need and, if such XXXX concludes that such EOP Need may be resolved on its Transmission System, the XXXX shall inform ColumbiaGrid of such resolution. In such instances, the Staff will include such EOP Need in the Draft System Assessment Report for informational purposes.

Related to Notification of Single System Projects

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Rectification of Safety Hazard 60.12 Where, because of the existence of a safety hazard, a site has been stopped for a defined period of time and Employees sent off site by agreement between Site Managers and any combination of Union Official/s, Health and Safety Committee, those people who remain on site to do rectification work will be paid at the rate of double time for all such work.

  • Access to Property Borrower shall permit agents, representatives and employees of Lender to inspect the Property or any part thereof at reasonable hours upon reasonable advance notice.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • Project Website The State will develop and maintain a website that will be made available in advance of the first public meeting for this project. The Engineer shall provide project information for the project website to the State including documents related to project background, study area limits, study objectives, project photos, study area maps, material presented at public meetings, and contact information for requesting additional information. The project website will be updated with the documents and other information provided by the Engineer to the State after each set of public meetings and the final report in PDF format provided by the Engineer will be posted by the State to give the general public access to the document.