Operational Window Sample Clauses

Operational Window. Operational Window shall mean the expected hours/duration of system (capacity) availability on each day during the term of the Contract, excluding: a. Maximum XXXX recovery time as specified in this document b. Grid Outages (duly certified to this effect by the Grid Operator) c. Planned Maintenance Outage duly informed by the BESSD to the off-taker with at least one month’s prior notice, subject to total no. of planned outage period being not more than 34 hours in a two-month period. BESSD will have to comply with the Charging and Discharging Schedule as intimated by Buying Entity. Alternation if any in Charging. It is clarified that discharge of XXXX shall take place subject to the transmission constraints at the ISTS substation. For example, discharge of power from XXXX during peak Solar hours (say, 11:00 AM- 2:00 PM) may be subject to the Grid constraints.
AutoNDA by SimpleDocs
Operational Window. Operational Window shall mean the expected hours/duration of system (capacity) availability on each day during the term of the Contract, excluding: a. Maximum XXXX recovery time as specified in this document b. Grid Outages (duly certified to this effect by the Grid Operator) c. Planned Maintenance Outage duly informed by the BESSD to the off-taker with at least one month’s prior notice, subject to total no. of planned outage period being not more than 34 hours in a two-month period. BESSD will have to comply with the Charging and Discharging Schedule as intimated by SLDC. Alternation if any in Charging. It is clarified that discharge of XXXX shall take place subject to the transmission constraints at the GETCO substation. For example, discharge of power from XXXX during peak Solar hours (say, 11:00 AM- 2:00 PM) may be subject to the Grid constraints.
Operational Window. Operational Window shall mean the expected hours/duration of system (capacity) availability on each day during the term of the Contract, excluding: a. Maximum XXXX recovery time as specified in this document b. Grid Outages (duly certified to this effect by the Grid Operator) c. Planned Maintenance Outage duly informed by the BESSD to the off-taker with at least one month’s prior notice, subject to total no. of planned outage period being not more than 34 hours in a two-month period. BESSD will have to comply with the Charging and Discharging Schedule as intimated by NVVN.
Operational Window. Operational Window shall mean the expected hours/duration of system (capacity) availability on each day during the term of the Contract, excluding: a. Maximum XXXX recovery time as specified in this document b. Grid Outages (duly certified to this effect by the Grid Operator) c. Planned Maintenance Outage duly informed by the BESSD to the off-taker with at least one month’s prior notice, subject to total no. of planned outage period being not more than 34 hours in a two-month period. BESSD will have to comply with the Charging and Discharging Schedule as intimated by SLDC/MSEDCL. Alternation if any in Charging. It is clarified that discharge of XXXX shall take place subject to the transmission constraints at the MSEDCL/MSETCL substation. For example, discharge of power from XXXX during peak Solar hours (say, 11:00 AM- 2:00 PM) may be subject to the Grid constraints.

Related to Operational Window

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Construction Phase Services 3.1.1 – Basic Construction Services