PAVEMENT MARKINGS AND MARKERS Sample Clauses

PAVEMENT MARKINGS AND MARKERS. (7-15-14) RWZ-3 Markings: All Facilities Pavement markings shall be installed in accordance with Standard Drawings 1205.01 through 1205.13 of the 2012 Roadway Standard Drawings and Section 1205 of the 2012 Standard Specifications with the exception of the 15 day edge line replacement requirement for two-lane, two-way roadways as described in Subarticle 1205-3(D) of the 2012 Standard Specifications. For all two-lane, two-way facilities, edge lines can be replaced within 30 calendar days after they have been obliterated.
AutoNDA by SimpleDocs
PAVEMENT MARKINGS AND MARKERS. (7-15-14) (rev. 1-15-19) RWZ-3 Markings: All Facilities Pavement markings shall be installed in accordance with Standard Drawings 1205.01 through 1205.15 of the 2018 Roadway Standard Drawings and Section 1205 of the 2018 Standard Specifications with the exception of the following changes underlined in Table 1205-1 in Subarticle 1205-3(D):

Related to PAVEMENT MARKINGS AND MARKERS

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • PACKING AND MARKING Seller shall package all Goods shipped under this Order in accordance with the requirements in this Order, or, if requirements are not specified, in accordance with standard commercial practices customary for similar shipments. When shipping any Goods that are food or food packaging, Seller will ship the Goods under sanitary conditions using carriers suitable for the transport of such Goods that will not render the Goods contaminated with filth, injurious to health, or otherwise adulterated (e.g., carriers that have not been used to transport garbage, waste or other refuse). In each master carton or container in which Goods are shipped, Seller shall include a certificate of analysis, bill of lading, and packing list indicating this Order number, description, quantity, HSY item numbers, and other identifying information corresponding to the information in this Order. Seller shall clearly mark all packages in accordance with all applicable laws and shall label each unit of the Goods with the country of origin, weight, and name of manufacturer. Seller shall ensure that a receiving document/proof-of-delivery is issued to HSY for any shipment made to a third party location. All costs, fines or penalties incurred or assessed due to improper packing or marking will be Seller’s responsibility, and if paid by HSY, will be deducted from amounts owed to Seller. Seller will notify HSY of the number of packages, size, weight, method of protection during shipment and method of storage and protection upon arrival at destination.

  • Sealing and Marking of Tenders 2.17.1 The Tenderer shall seal the original and each copy of the tender in separate envelopes, duly marking the envelopes as “ORIGINAL” and “COPY.” The envelopes shall then be sealed in an outer envelope.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Markings 4.8.1. Every hose shall bear, at intervals of not greater than 0.5 m, the following clearly legible and indelible identification markings consisting of characters, figures or symbols.

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Sealing and Marking of Bids 21.1 The bidder shall seal the original and each copy of the bid in separate envelopes duly marking the envelopes “ORIGINAL” and “COPY”. The envelopes shall then be sealed in an outer separate envelope.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Abuse, Neglect, Exploitation Grantee will;

Time is Money Join Law Insider Premium to draft better contracts faster.