Phase 2 Park Sample Clauses

Phase 2 Park. Subject to the applicable conditions precedent set forth in Section 2.3.4, at the request of the City at such time as the City is prepared to commence and complete development of the portion of the Phase 2 Park on Lot 22 in accordance with the terms of the Master Development Agreement, the County shall convey to the City all of the County’s right, title and interest in Lot 22, pursuant to a deed in the form of Exhibit B hereto (with appropriate insertions in such deed for conformance to Section 2.3.5). Subject to the applicable conditions precedent set forth in Section 2.3.4, at the request of the City at such time as the City is prepared to commence and complete development of the portion of the Phase 2 Park within Lot 23B in accordance with the terms and conditions of the Master Development Agreement, the County shall convey to the City all of the County’s right, title and interest in Xxx 00X, xxxxxxxx to a deed in the form of Exhibit B hereto (with appropriate insertions in such deed for conformance to Section 2.3.5). Subject to the applicable conditions precedent set forth in Section 2.3.4, at the request of the City at such time the City is prepared to commence and complete development of the portion of the Phase 2 Park on Lot 28 in accordance with the terms of the Master Development Agreement, the County shall convey to the City all of the County’s right, title and interest in Lot 28 (or the air lot portion thereof, if the Public Parties elect to construct Parking Facilities on the surface lot portion of Lot 28), pursuant to a deed in the form of Exhibit B hereto (with appropriate insertions in such deed for conformance to Section 2.3.5).
AutoNDA by SimpleDocs

Related to Phase 2 Park

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Development Area 10.4. The Development Area shall encompass all Deposits to be produced.

  • Porcupine Site Highway 11

  • MAINTENANCE OF THE BUILDING /APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the Association upon the issuance of the completion certificate of the Project. The cost of such maintenance has been included in the Total Extras and Deposits as mentioned in clause 1.2.

  • SHOPPING CENTRES 1. The general terms and provisions of the VBIA shall apply to “Shopping Centres” (as defined) with the following variations:

  • PROJECT 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • MAINTENANCE OF THE SAID BUILDING / APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the association of the allottees. The cost of such maintenance has been included in the Total Price of the [Apartment/Plot]. [Insert any other clauses in relation to maintenance of project, infrastructure and equipment]

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

Time is Money Join Law Insider Premium to draft better contracts faster.