Phase3: System Audit Sample Clauses

Phase3: System Audit. This phase involves conducting an on-site inspection of the buyer’s premises by the service provider’s audit team. The service provider is expected to do study of current water usage pattern and systems for water use under various sectors such as irrigation, industry and commerce, hydropower, domestic water supply, thermal power and others and check their operational efficiency and level of maintenance. This includes measurement of the water consumption pattern, outputs, specifications etc. for typical/identified machines and recording of parameters as applicable including, leakages in the system, control requirements and the existing systems installed efficiency of the equipment, etc. The same study and standardization to be used for recommending implement any modifications or up- gradations of the existing systems. Measurement methodology from the intake point of the system through various sub-systems to the ultimate user points needs to be verified periodically for its suitability, efficiency and accuracy. Bulk metering should be done at the source for zones, districts etc. and revenue metering for consumers to identify the reaches of undue wastewater generation.
AutoNDA by SimpleDocs

Related to Phase3: System Audit

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Customer Audit Customer or its independent third party auditor reasonably acceptable to SAP (which shall not include any third party auditors who are either a competitor of SAP or not suitably qualified or independent) may audit SAP’s control environment and security practices relevant to Personal Data processed by SAP only if:

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Project Review A. Programmatic Allowances

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

Time is Money Join Law Insider Premium to draft better contracts faster.