Physiography and Drainage Sample Clauses

Physiography and Drainage. Overall area is flat and at some places undulated. The general ground level of the study area varies from 460 MRL to 490 MRL. The highest elevation is 490 MRL in western side and the lowest is 460 MRL on the eastern side, in the lease area. The lease area is located near village Xxxxxxxxxx and Sutda at a distance of 1.0 to 1.5 km on North – West side General drainage of the mine is towards south. Rain water follows the contours of topography. A perennial river Eru, as a surface water source, flows at a distance of 1 km south from the lease area, as shown in the key plan.
AutoNDA by SimpleDocs

Related to Physiography and Drainage

  • Bibliography [Ben83] Xxxxxxx Xxx-Or. Another advantage of free choice (extended ab- stract): Completely asynchronous agreement protocols. In Proceed- ings of the second annual ACM symposium on Principles of distrib- uted computing, pages 27–30. ACM, 1983. [BG89] Xxxxx Xxxxxx and Xxxx X Xxxxx. Asymptotically optimal distributed consensus. Springer, 1989. [BGP89] Xxxxx Xxxxxx, Xxxx X. Xxxxx, and Xxxxxxx X. Xxxxx. Towards optimal distributed consensus (extended abstract). In 30th Annual Symposium on Foundations of Computer Science, Research Triangle Park, North Carolina, USA, 30 October - 1 November 1989, pages 410–415, 1989. [BT85] Xxxxxxx Xxxxxx and Xxx Xxxxx. Asynchronous consensus and broadcast protocols. Journal of the ACM (JACM), 32(4):824–840, 1985. [DGM+11] Xxxxxxxx Xxxxx, Xxxxxx Xxx Xxxxxxxx, Xxxxxx Xxxxxx, Xxxxxx Xxxxxxxxx, and Xxxxxxxxx Xxxxxxxxxx. Stabilizing Consensus with the Power of Two Choices. In Proceedings of the Twenty-third Annual ACM Symposium on Parallelism in Algorithms and Architectures, SPAA, June 2011. [DS83] Xxxxx Xxxxx and X. Xxxxxxx Xxxxxx. Authenticated algorithms for byzantine agreement. SIAM Journal on Computing, 12(4):656–666, 1983. [FG03] Xxxxxxxx Xxxxx and Xxxx X Xxxxx. Efficient player-optimal protocols for strong and differential consensus. In Proceedings of the twenty- second annual symposium on Principles of distributed computing, pages 211–220. ACM, 2003.

  • Cryptography Supplier will maintain policies and standards on the use of cryptographic controls that are implemented to protect Accenture Data.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

  • Devices BNY Mellon will restrict the transfer of Customer Data from its network to mass storage devices. BNY Mellon will use a mobile device management system or equivalent tool when mobile computing is used to provide the services. Applications on such authenticated devices will be housed within an encrypted container and BNY Mellon will maintain the ability to remote wipe the contents of the container.

  • Barriers and diversions The Authority shall procure that during the Operation Period, no barriers are erected or placed by any Government Instrumentality on the Bus Terminal except for reasons of Emergency, national security, or law and order.

  • Panels (1) The composition of panels and the assignment of cases to panels shall be governed by the Rules of Procedure. One judge of the panel shall be appointed as the presiding judge, in accordance with the Rules of Procedure.

  • Workplace Violence Prevention A. In order to provide a safe and healthy workplace for employees, the State agrees to develop and implement "Workplace Violence Prevention" policies and programs.

Time is Money Join Law Insider Premium to draft better contracts faster.