Point of Change of Ownership. The Point of Change of Ownership shall be at the pull section of the new 12kV switchboard panel provided, installed, and owned by the Interconnection Customer.
AutoNDA by SimpleDocs
Point of Change of Ownership. The point, as set forth in Attachment 3 to this SGIA, where the Interconnection Customer's Interconnection Facilities connect to the Distribution Provider’s Interconnection Facilities.
Point of Change of Ownership. The Point of Change of Ownership shall be the point where the Distribution Provider's conductors terminate at the Interconnection Customer’s Last Structure. The Distribution Provider will own and maintain the conductors and the insulators, on the Distribution Provider’s side of the Last Structure, that are used to attach the Distribution Provider's conductors to the Last Structure.
Point of Change of Ownership. The point where the Applicant Interconnection Facilities connect to GTC Interconnection Facilities, identified in Appendix A.
Point of Change of Ownership. The Customer owns all facilities electrically downstream from the Company’s strain insulators, located on the Customer’s take-off structure (with exception of Company billing metering transformers and meter and lightning arresters which are tapped on the line side of the Customer’s main disconnect switch 1788). Attachment 3 One-line Diagram Depicting the Small Generating Facility, Interconnection Facilities, Metering Equipment, and Upgrades Attachment 4
Point of Change of Ownership. (a) Antelope – Western Antelope Dry Ranch 66 kV Transmission Line: The Point of Change of Ownership shall be the point where the conductors of the Antelope – Western Antelope Dry Ranch 66 kV Transmission Line are attached to the Last Structure, which will be connected on the side of the Last Structure facing Antelope Substation. The Interconnection Customer shall own and maintain the Last Structure, the conductors, insulators and jumper loops from such Last Structure to the Interconnection Customer’s Small Generating Facility. The Participating TO will own and maintain the Antelope Substation, as well as all circuit breakers, disconnects, relay facilities and metering within the Antelope Substation, together with the line drop, in their entirety, from the Last Structure to Antelope Substation. The Participating TO will own the insulators that are used to attach the Participating TO-owned conductors to the Last Structure.
Point of Change of Ownership. The Point of Change of Ownership shall be the point where the Distribution Provider’s conductor is attached to the Interconnection Customer’s 12 kV pull section terminals at the new switchboard panel. The Interconnection Customer shall own and maintain the switchboard panel, the conductors, insulators and jumper loops from the switchboard panel to the Interconnection Customer’s Generating Facility.
AutoNDA by SimpleDocs
Point of Change of Ownership. The Point of Change of Ownership shall be the point where the conductors of the Distribution Provider’s 33kV line are attached to the Interconnection Customer’s 33kV line at the Last Structure. The Interconnection Customer shall own and maintain the Last Structure, the conductors, insulators and jumper loops from such Last Structure to the Interconnection Customer’s Generating Facility. The Distribution Provider will own the insulators that are used to attach the Distribution Provider’s conductors to the Last Structure.
Point of Change of Ownership. The Point of Change of Ownership is where the Interconnection Customer’s generator tie line terminates on GPC’s dead-end structure at the IC-394/410 Interconnecting Substation.
Point of Change of Ownership. The Customer owns all facilities electrically downstream from the Company’s strain insulators, located on the Customer’s take-off structure (with exception of Company billing metering transformers and meter and lightning arresters which are tapped on the line side of the Customer’s main disconnect switch 1788). Attachment 3 One-line Diagram Depicting the Small Generating Facility, Interconnection Facilities, Metering Equipment, and Upgrades Attachment 4 Milestones In-Service Date: Critical milestones and responsibility as agreed to by the Parties: Milestone/Date