Pre-Design. A. BION will coordinate the pre-design activities required for the design of the Bion NMS to be constructed at each UNIT. The pre-design information detailed below must be provided to BION to ensure proper design and construction of the Bion NMS. B. BION will coordinate with CSF to obtain the site specific information required by BION to complete the individually designed Bion NMS. The information needed to complete the design is as follows: topographic survey information, geologic information, regulatory information, wetlands information, and flood prone areas information, and such other information as BION may require to design the Bion NMS systems which information will be supplied by CSF at their cost as long as such cost is reasonable.
Appears in 2 contracts
Samples: Installation Agreement (Bion Environmental Technologies Inc), Installation Agreement (Bion Environmental Technologies Inc)
Pre-Design. A. BION will coordinate the pre-design activities required for the design of the Bion NMS to be constructed at each UNIT. The pre-design information detailed below must be provided to BION to ensure proper design and construction of the Bion NMS.
B. BION will coordinate with CSF BFF to obtain the site specific information required by BION to complete the individually designed Bion NMS. The information needed to complete the design is as follows: topographic survey information, geologic information, regulatory information, wetlands information, and flood prone areas information, and such other information as BION may require to design the Bion NMS systems which information will be supplied by CSF BFF at their cost as long as such cost is reasonable.
Appears in 1 contract
Samples: Installation Agreement (Bion Environmental Technologies Inc)