Preliminary Lemmas Sample Clauses

Preliminary Lemmas. ‌ We now state several results we will need throughout the argument. We will need to apply a version of the Poisson summation formula.
AutoNDA by SimpleDocs
Preliminary Lemmas. We prove in this section some useful properties and lemmas on reconciliations. The following fact follows directly from the impossibility that all children of a parasite node jump to incomparable host tree nodes. Fact 3. Given any reconciliation q : V (P ) → V (H), for each node u ∈ V (P ):
Preliminary Lemmas. In this section we will prove all preliminary lemmas needed to show pan- cyclicity of 4-connected {K1,3, N(i, j, k)}-free graphs, with i, j, k ≥ 0 and i + j + k = 5. At first, we will consider cycles that do contain chords and afterwards we will consider induced cycles. To show Lemma 4.2 we will follow the basic idea that was used in [13] to show that a 3-connected {T }- free graph, where T is one of N(4, 0, 0), N(3, 1, 0) or P7, is pancyclic. In particular, we use this lemma from [13] to prove the theorem that follows.

Related to Preliminary Lemmas

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Preliminary Schedule A preliminary schedule of construction indicating the starting and completion dates of the various stages of the Work, including any information and following any form as may be specified in the Specifications. Once approved by District, this shall become the Construction Schedule. This schedule shall include and identify all tasks that are on the Project’s critical path with a specific determination of the start and completion of each critical path task as well as all Contract milestones and each milestone’s completion date(s) as may be required by the District.

  • Preliminary Hearing (1) If an employee is suspended without pay pending a hearing on disposition of charges for removal, the president or the president's designated representative shall notify the employee in writing of the reasons for the suspension at the time of the notice of the suspension.

  • Preliminary Examination 2.22.1 The Procuring entity will examine the tenders to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed, and whether the tenders are generally in order.

  • Preliminary Matters The Chair of the Hearing Panel will ask each party if it has any objections to the constitution of the Hearing Panel. Responses will be noted and recorded. If an objection is raised, the party raising the objection will be asked to immediately outline the objection. The Hearing Panel will then determine the merits of the objection.

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • Preliminary 4. The business of the Company may be commenced at any time after incorporation.

  • Preliminary Cost Estimate Consulting Engineer/Architect shall furnish City an estimate of probable Construction Cost based on the preliminary design. Consulting Engineer/Architect's estimate of probable Construction Cost is to be made on the basis of Consulting Engineer/Architect's experience and qualifications and represent Consulting Engineer/Architect's best judgment as an experienced and qualified design professional, familiar with the construction industry.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Preliminary Provisions 2. The Agreement is declared to be an Enrolment Contract in terms of section 2 of the Act.

Time is Money Join Law Insider Premium to draft better contracts faster.