Preparation of Base Sample Clauses

Preparation of Base. Any pot holes in the existing bituminous road surface and broken edges shall be patched well and the surface shall be brought to correct level and camber with additional metal and bitumen as required which will be paid separately. Before starting the work the bituminous surface shall be swept clean of all the dirt, mud cakes, animal droppings & other loose foreign material. If so required by the Engineer, the contractor shall keep the side width & nearby diversion watered to prevent dust from blowing over the surface to be bituminous. Existing water bound macadam surface shall be picked for and surface loosened for a dept of 2.5 cm and the picked surface shall be brought approximately to the correct camber and section Edge line shall be correctly marked by dog belling the surface to form a continuous the notch. There shall always be sufficient length of prepared surface ahead of the bituminous surfacing operations as directed by the Engineer to keep these operations continuous.
AutoNDA by SimpleDocs
Preparation of Base. Before the carpet is applied to the existing base, the surface shall be cleaned by removing dirt caked earth and other foreign matter with wire brushes, sweep with brooms and finally fanning the cleaned surface with gunny bags as described in 20.A. 27.1 of SSR Part-I.

Related to Preparation of Base

  • Preparation of Agreement This Agreement shall not be construed more strongly against any party regardless of who is responsible for its preparation. The parties acknowledge each contributed and is equally responsible for its preparation.

  • PREPARATION OF BIDS 12 LANGUAGE OF BID

  • Preparation Period During the preparation period, a teacher will have no other assignment except in an emergency situation. It is recognized that the preparation period is a scheduled part of the teacher's work day and the teacher is expected to be in his/her respective Building. If the teacher must leave the Building during his/her preparation and/or lunch period, he/she must notify the Building switchboard operator.

  • Construction Preparation Period 2.1.3 Construction Management Plan

  • Preparation Awarded vendor shall not begin a project for which TIPS Member has not prepared the site, unless awarded vendor does the preparation work at no cost, or until TIPS Member includes the cost of site preparation in a purchase order. Site preparation includes, but is not limited to: moving furniture, installing wiring for networks or power, and similar pre-installation requirements. Registered sex offender restrictions: For work to be performed at schools, awarded vendor agrees that no employee of a sub-contractor who has been adjudicated to be a registered sex offender will perform work at any time when students are, or reasonably expected to be, present. Awarded vendor agrees that a violation of this condition shall be considered a material breach and may result in the cancellation of the purchase order at the TIPS Member’s discretion. Awarded vendor must identify any additional costs associated with compliance of this term. If no costs are specified, compliance with this term will be provided at no additional charge. Safety measures: Awarded vendor shall take all reasonable precautions for the safety of employees on the worksite, and shall erect and properly maintain all necessary safeguards for protection of workers and the public. Awarded vendor shall post warning signs against all hazards created by the operation and work in progress. Proper precautions shall be taken pursuant to state law and standard practices to protect workers, general public and existing structures from injury or damage.

  • Preparation Periods 31-1 The School District agrees to maintain daily preparation periods during the student day in all junior and senior high schools. At schools where block scheduling is in effect, the total preparation time provided shall be equal to the preparation time provided at schools not operating on a block schedule.

  • Preparation of Tenders ITT 10 (j) The Tenderer shall submit the following additional documents in its Tender: N/A ITT 12.1 Alternative Tenders shall not be considered.

  • Finalization of Evaluation A Written Report 1 Before the evaluation cycle is final, and not later than May 10, a copy of the formal written evaluation report shall be given to the teacher and a conference shall be held between the teacher and the evaluator.

  • Preparation and Submission The Recipient will:

  • Preparation of Presentence Report The defendant understands the United States will provide to the Court and the United States Probation Office a government version of the offense conduct. This may include information concerning the background, character, and conduct of the defendant, including the entirety of his criminal activities. The defendant understands these disclosures are not limited to the count to which he has pleaded guilty. The United States may respond to comments made or positions taken by the defendant or the defendant’s counsel and to correct any misstatements or inaccuracies. The United States further reserves its right to make any recommendations it deems appropriate regarding the disposition of this case, subject only to any limitations set forth in this plea agreement. The United States and the defendant expressly reserve the right to speak to the Court at the time of sentencing pursuant to Rule 32(i)(4) of the Federal Rules of Criminal Procedure.

Time is Money Join Law Insider Premium to draft better contracts faster.