procurement-construction Sample Clauses

procurement-construction management-agreement 1/1 Downloaded from xxxxxx0.xxxxxxxxxxxx.xxx on February 3, 2021 by guest
AutoNDA by SimpleDocs
procurement-construction. SCOPE OF SUPPLY Contractor shall provide all necessary labor, materials, equipment, and services required to install complete integrated turnkey PV systems. Contractor shall supply all solar modules, mounting equipment, inverters, AC and DC disconnect switches, metering, related wiring, monitoring equipment, and all ancillary equipment necessary to install the PV system and interconnect it to the City electrical distribution system. The PV system installations shall comply with all Contract requirements, technical specifications, approved design documents, and applicable regulatory codes and requirements. Contractor shall submit As-Built Construction Drawings an electronic copy in both PDF and DWG format on USB Flash drive to the City after completion of the Proving Period for each system at each site. MATERIALS AND EQUIPMENT Materials and equipment incorporated in the Work shall be new and suitable for the use intended. No material or equipment shall be used for any purpose other than that for which it is designed, specified or indicated. Contractor shall use means necessary to protect the materials and equipment before, during and after installation. Contractor shall promptly replace lost or damaged materials and equipment with equal, or City-approved, replacements, or repair them, at no additional cost to the City. QUALITY ASSURANCE AND QUALITY CONTROL Contractor shall implement a Quality Assurance / Quality Control (QA/QC) plan for construction activities on within the Project limits. At least 30 Calendar Days prior to the planned commencement of construction, Contractor shall submit an electronic copy in Adobe PDF format of the QA/QC Plan for review and approval by the City. The City’s Quality Assurance Plan is attached hereto for reference in Attachment A.2. To ensure the highest quality of the installation, Contractor shall: Implement policies and procedures to ensure proper oversight of construction Work, verification of adherence to construction documents and contractual requirements, and rapid identification and mitigation of issues and risks. Utilize best practice methods for communicating progress, performing Work according to the approved Project schedule, and completing the Project on-time. The Contractor shall remove and dispose of waste, surplus materials, trash/rubbish and similar items in accordance with the Elk Grove Municipal Code Title 30 “Solid Waste Management” through the duration of construction. The Contractor shall clean the enti...
procurement-construction 

Related to procurement-construction

  • Agreement Construction Headings or captions to the provisions of this Agreement are solely for the convenience of the parties, are not part of this Agreement, and shall not be used to interpret or determine the validity of this Agreement. Any ambiguity in this Agreement shall not be construed against the drafter, but rather the terms and provisions hereof shall be given their reasonable interpretation.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • General construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Liberal Construction The Covenants hereof shall be liberally construed to promote and accomplish the objectives set forth in the Recitals.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • BUILDER’S RISK FOR CONSTRUCTION RENOVATION PROJECTS If the project is CONSTRUCTION RENOVATION of an existing structure, and the State has already determined that Contractor will not be obligated to obtain and maintain Builder’s Risk insurance, then the following provisions apply:

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

Time is Money Join Law Insider Premium to draft better contracts faster.