Protocol The attached Protocol shall be an integral part of this Agreement.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Study An application for leave of absence for professional study must be supported by a written statement indicating what study or research is to be undertaken, or, if applicable, what subjects are to be studied and at what institutions.
Fabrication Making up data or results and recording or reporting them.
RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.
Clinical 1.1 Provides comprehensive evidence based nursing care and individual case management to a specific group of patients/clients including assessment, intervention and evaluation. 1.2 Undertakes clinical shifts at the direction of senior staff and the Nursing Director including participation on the on-call/after-hours/weekend roster if required. 1.3 Responsible and accountable for patient safety and quality of care through planning, coordinating, performing, facilitating, and evaluating the delivery of patient care relating to a particular group of patients, clients or staff in the practice setting. 1.4 Monitors, reviews and reports upon the standard of nursing practice to ensure that colleagues are working within the scope of nursing practice, following appropriate clinical pathways, policies, procedures and adopting a risk management approach in patient care delivery. 1.5 Participates in xxxx rounds/case conferences as appropriate. 1.6 Educates patients/carers in post discharge management and organises discharge summaries/referrals to other services, as appropriate. 1.7 Supports and liaises with patients, carers, colleagues, medical, nursing, allied health, support staff, external agencies and the private sector to provide coordinated multidisciplinary care. 1.8 Completes clinical documentation and undertakes other administrative/management tasks as required. 1.9 Participates in departmental and other meetings as required to meet organisational and service objectives. 1.10 Develops and seeks to implement change utilising expert clinical knowledge through research and evidence based best practice. 1.11 Monitors and maintains availability of consumable stock. 1.12 Complies with and demonstrates a positive commitment to Regulations, Acts and Policies relevant to nursing including the Code of Ethics for Nurses in Australia, the Code of Conduct for Nurses in Australia, the National Competency Standards for the Registered Nurse and the Poisons Act 2014 and Medicines and Poisons Regulations 2016. 1.13 Promotes and participates in team building and decision making. 1.14 Responsible for the clinical supervision of nurses at Level 1 and/or Enrolled Nurses/ Assistants in Nursing under their supervision.
Manufacturing (a) The Supplier shall without limitation be responsible, at no additional cost to the Purchaser, for: sourcing and procuring all raw materials for the Products; obtaining all necessary approvals, permits and licenses for the manufacturing of the Products; providing sufficient qualified staff and workers to perform the obligations under this Purchase Agreement; implementing and maintaining effective inventory and production control procedures with respect to the Products; and handling other matters as reasonably requested by the Purchaser from time to time. (b) The Supplier shall not change any process, material, component, packaging or manufacturing location without the Purchaser’s express prior written approval.
Construction Phase Services 3.1.1 – Basic Construction Services
Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).
Escrow Format Specification Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.