Production of Copper Ore and Copper Concentrate Sample Clauses

Production of Copper Ore and Copper Concentrate. 96 20.1. Production of Copper Ore and Copper Concentrate 96 20.2. Annual Production Program 96 20.3. Extension of Annual Production Programme 97 20.4. Damages for shortfall 97 20.5. Desired quality of copper ore and copper concentrate 98 20.6. Quality Slippage 99 20.7. Delivery Point 100 Article 21. Stockyard(s) 101 21.1. Stockyard(s) 101 21.2. Facilities and equipment at Stockyard(s) 101 Article 22. Storage, Testing and Weighment 102 22.1. Storage of Copper Ore, Copper Concentrate, Tailings 102 22.2. Sampling and Testing of Cu and Moisture for Copper Ore and Concentrate 102 22.3. Reporting of Copper Ore and Copper Concentrate 102 22.4. Weighment of Copper Ore and Quantity of Produced Concentrate 103 Article 23. Dispatch of Copper ore and Concentrate 104 23.1. Dispatch of Copper Ore and concentrate 104 23.2. Loading and Dispatch of Copper Ore and concentrate 104 23.3. Title and Risk in Copper 104 Article 24. Key Performance Indicators 105 24.1. Key Performance Indicators 105 24.2. Production Programme, Development Schedule, Project Milestones and desired MIO, MIC quality 105 24.3. Adjustments in Revenue Share 105 24.4. Monthly Report 105 Article 25. PERSONNEL AND SUBCONTRACTING 106 25.1. Personnel 106 25.2. Subcontracting 106 Article 26. Revenue Sharing 109 26.1. Revenue Sharing 109 26.2. Valuation of the services provided by MDO 109 26.3. Additional Capacity 110 26.4. Taxes and duties 110 26.5. Stockpiling 111 26.6. Charges for any other metals 111 26.7. First right of buying 111
AutoNDA by SimpleDocs
Production of Copper Ore and Copper Concentrate. 20.1.1 The MDO shall excavate and process copper ore in accordance with the Annual Production Programme specified in this Article 20;

Related to Production of Copper Ore and Copper Concentrate

  • Unbundled Copper Loops (UCL) 2.4.1 BellSouth shall make available Unbundled Copper Loops (UCLs). The UCL is a copper twisted pair Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters) and is not intended to support any particular telecommunications service. The UCL will be offered in two types – Designed and Non-Designed.

  • Unbundled Loop Concentration 2.8.5.1 Upon the Effective Date of this Amendment, the Unbundled Loop Concentration (ULC) element will no longer be offered by BellSouth and no new orders for ULC will be accepted. Any existing ULCs that were provisioned prior to the Effective Date of this Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to this Amendment and may remain connected, maintained and repaired according to BellSouth’s TR73600 until such time as they are disconnected by MyLineToo, or BellSouth provides ninety (90) calendar days notice that such ULC must be terminated.

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • Unbundled Loop Concentration (ULC) System 2.5.1 BellSouth will provide to <<customer_name>> Unbundled Loop Concentration (ULC). Loop concentration systems in the central office concentrate the signals transmitted over local loops onto a digital loop carrier system. The concentration device is placed inside a BellSouth central office. BellSouth will offer ULC with a TR008 interface or a TR303 interface.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the End User’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the End User and the cross-box.

  • Unbundled Copper Loop Designed (UCL-D)

  • Green Economy/Carbon Footprint a) The Supplier/Service Provider has in its bid provided Transnet with an understanding of the Supplier’s/Service Provider’s position with regard to issues such as waste disposal, recycling and energy conservation.

Time is Money Join Law Insider Premium to draft better contracts faster.