Project Design, Construction and Operation Sample Clauses

Project Design, Construction and Operation. (a) Seller shall, at Seller's expense, design, construct, install, operate, and maintain Seller's Project. Specific special Project requirements as noted in the interconnection study to be conducted by Sierra shall be incorporated into the design of the Project. Seller shall provide Sierra with those specifications, drawings, and electrical data concerning the Project necessary to allow Sierra to make stability and protection studies. All specifications and changes in specifications, including new or additional equipment, shall be subject to Sierra's review and acceptance. Such review and acceptance shall be completed promptly but in no event longer than sixty (60) days after receipt by Sierra and shall be for the sole purpose of insuring that Seller's Project is compatible with Sierra's system. Such acceptance shall not be unreasonably withheld. Sierra's acceptance of Seller's specifications, drawings, and electrical data shall not be construed as confirming nor endorsing the design, nor as a warranty of safety, durability, or reliability of the Project. Sierra shall not, by reason of any review, acceptance, or failure to review, be responsible for the Project, including but not limited to the strength, details of design, adequacy or capacity thereof, nor shall Sierra's acceptance be deemed to be an endorsement of the Project.
AutoNDA by SimpleDocs
Project Design, Construction and Operation. (a) Seller shall, at Seller's expense, design, construct, install, operate, and maintain Seller's Project. Seller accepts that it is designing a Project to be integrated into a utility delivery system, and that it is designing a Project and Interconnection Equipment to be compatible with the operational standards of reliability and availability of Sierra's system. Specific Project requirements as noted in the interconnection study to be conducted by Sierra shall be incorporated into the design of the Project. Seller shall provide Sierra with those specifications, drawings, and electrical data concerning the Project necessary to allow Sierra to make stability and protection studies. All specifications and changes in specifications, including new or additional equipment, shall be subject to Sierra's review and acceptance. Such review and acceptance shall be completed promptly but in no event longer than sixty (60) days after receipt by Sierra and shall be for the sole purpose of insuring that Seller's Project is compatible with Sierra's system. Such acceptance shall not be unreasonably withheld. Sierra's acceptance of Seller's specifications, drawings, and electrical data shall not be construed as confirming nor endorsing the design, nor as a warranty of safety, durability, or reliability of the Project. Sierra shall not, by reason of any review, acceptance, or failure to review, be responsible for the Project, including but not limited to the strength, details of design, adequacy or capacity thereof, nor shall Sierra's acceptance be deemed to be an endorsement of the Project.
Project Design, Construction and Operation. 1. The Joint Company shall be the owner of the Projects and shall be in charge of project design, construction and operation.
Project Design, Construction and Operation 

Related to Project Design, Construction and Operation

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • Initial Construction Attached hereto are plans showing proposed modifications to Premises. Within 20 days of execution of the Lease, Landlord will prepare construction drawings and specifications for such modifications containing such details as dimensions, partition plans, dimensioned electrical and telephone outlet plans, modified reflected ceiling plans, room finish schedule, including wall, carpet, floor tile, and VCT colors, and other necessary construction details and specifications for the completion of such work, all in a manner reasonably acceptable to Tenant. Space planning, construction drawings, and specifications shall be provided by Landlord to Tenant a no cost to Tenant. All construction of modifications to Tenant's Premises will be accomplished by Tenant's contractor, which contractor shall furnish to Landlord evidence of insurance as follows: General Liability and Property Damage - $2,000,000 Aggregate, $2,000,000 per Occurrence; Workmens Compensation, and an Owners and Contractors Protective Liability Policy in the amount of $1,000,000 naming the owner and The Gutixxxxx Xxxpany as insureds. In addition, in Tenant's construction contract, Tenant shall insure that the contract holds Landlord and The Gutixxxxx Xxxpany harmless, and that Landlord and The Gutixxxxx Xxxpany are additional named insureds on all of Tenant's insurance policies. It shall be Tenant's contractor's responsibility to obtain the building permit for said modifications to Premises. It shall be Tenant's responsibility to insure that all Tenant's general contractors subcontractors and materialmen are paid in full, and if a lien is placed upon the Building by any such contractor, subcontractor, materialmen, or other, to promptly remove such lien or provide a bond reasonably satisfactory to Landlord and Landlord's mortgagee to insure that such lien will be paid in full while contesting such lien. Landlord shall permit Tenant and Tenant's contractor access for construction of modifications to Tenant's premises promptly after execution hereof. All changes and additions shall be part of the Building, except such items as by writing at the time of approval the parties agree either shall be removed by Tenant on termination of this Lease, or shall be removed or left at Tenant's election.

  • Specific Shall Not Limit General; Construction No specific provision contained in this Note shall limit or modify any more general provision contained herein. This Note shall be deemed to be jointly drafted by the Company and the Holder and shall not be construed against any person as the drafter hereof.

  • General Construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Operation and Maintenance 17.1 O&M obligations of the Concessionaire

  • Legal Construction If one or more of the provisions contained in this Agreement shall for any reason be held invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provisions and this Agreement shall be construed as if it did not contain the invalid, illegal, or unenforceable provision.

  • Construction of the Project The Allottee has seen the proposed layout plan, specifications, amenities and facilities of the Apartment/ Plot and accepted the floor plan, payment plan and the specification, amenities and facilities annexed along with this Agreement which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the said layout plans, floor plans and specifications, amenities and facilities. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the bye-laws, FAR, and density norms and provisions prescribed by the relevant building bye-laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act, and breach of this term by the Promoter shall constitute a material breach of this Agreement.

  • Construction of Project 11.1.1 Developer agrees to cause the Project to be developed, constructed, and installed in accordance with the terms hereof and the Construction Provisions set forth in Exhibit D, including those things reasonably inferred from the Contract Documents as being within the scope of the Project and necessary to produce the stated result even though no mention is made in the Contract Documents.

  • OPERATION AND MAINTENANCE OF COMMON AREAS During the Term, Landlord shall operate all Common Areas within the Building and the Project. The term “Common Areas” shall mean all areas within the Building, Project and other buildings in the Project which are not held for exclusive use by persons entitled to occupy space.