Proposed E-Beam Layout Sample Clauses

Proposed E-Beam Layout. To provide protection from ionizing energy, the SureBeam system uses a concrete shield sized to contain the E-beam accelerator and material handling system. The shield consists of concrete walls and roof. Thickness gradually decreases as you move from the beam area to the entry or exit portions of the maze. The purpose of the maze is to provide several 90° turns that provide a “torturous path” limiting any ionizing radiation from escaping (i.e. no direct line of sight path). The shield design features a common wall between E-Beam and X-Ray systems. The E-Beam portion of the shield occupies approximately 4,000ft2 with the overall shield occupying 7,500ft2. The accelerator centerlines are located inside of the shield and protected from ionizing radiation and ozone by interior walls. The accelerator design philosophy is to limit variability in the accelerator to one parameter (scan width). All other operating parameters (such as energy, and power) are fixed at validated set points and pre-defined high/low limits. The goal is to provide stable equipment operation that always produces a consistent, uniform beam. If the beam characteristics exceed pre-defined limits, then the system is shutdown. The system utilizes two split-beam accelerators that enable double-sided processing. A unique scan horn directs the beam to the top and bottom of product in an opposed fashion. Each accelerator is dedicated to a single processing lane. The split beam approach eliminates the need to flip product and facilitates very high speed processing by eliminating product transfers (patent pending). In addition, double sided processing increases the efficiency and throughput of the system as well as increase the uniformity of the delivered dose. Product is conveyed into the shield and through the e-beam process on a material handling system that was specifically designed to operate in a food processing application. Basic transport functions are accomplished using powered roller conveyor. This conveyor efficiently moves product from the load station to the beam area and back out to the unload station. The conveyor close packs product prior to processing for further efficiency. To achieve precise dose delivery an independent process conveyor is used to control the movement of product through the e-beam field. An independent servo controlled conveyor is used to achieve positioning and speed control of ±0.5% variance from the set point. The SureTrack information and control system overse...
AutoNDA by SimpleDocs

Related to Proposed E-Beam Layout

  • APPROVAL OF PLANS AND SPECIFICATIONS The Plans and Specifications will conform to the requirements and conditions set out by applicable law or any effective restrictive covenant, and to all governmental authorities which exercise jurisdiction over the Leased Premises or the construction thereon.

  • Budget For Tenant Improvements A preliminary detailed breakdown by trade of the costs incurred or that will be incurred in connection with the design and construction of the Tenant Improvements is set forth on Schedule 3 attached hereto (the “Budget”). The Budget is based upon the TI Construction Drawings approved by Tenant and shall include a payment to Landlord of administrative rent (“Administrative Rent”) equal to 1.5% of the TI Costs, which Administrative Rent shall include, without limitation, all out-of-pocket costs, expenses and fees incurred by or on behalf of Landlord arising from, out of, or in connection with monitoring the construction of the Tenant Improvements and Changes, and shall be payable out of the TI Fund. Landlord shall provide Tenant with a final Budget promptly following approval of the TI Construction Drawings by Landlord and Tenant. The Budget shall be subject to Tenant’s review and approval which approval shall not be unreasonably withheld, conditioned or delayed by Tenant. Tenant shall have the right to approve any use of the contingency in the Budget by Landlord; provided, however, that, Tenant’s approval shall not be unreasonably withheld, conditioned or delayed, and the contingency shall not be available for use by Tenant for any Changes until all unforeseen conditions, changes to resulting from governmental agencies and the like have first been paid for out of the contingency.

  • Initial Budget The initial Budget shall be agreed upon by the parties before the execution of this Management Services Agreement and shall be attached hereto and made a part hereof.

  • Regulatory and Special Allocations Notwithstanding the provisions of Section 5.01:

  • Plans and Specifications Tenant shall be solely responsible for the preparation of the final architectural, electrical and mechanical construction drawings, plans and specifications (called “plans”) necessary for Tenant to construct the Premises for Tenant’s occupancy, which plans shall be subject to approval by Landlord’s architect and engineers and shall comply with their reasonable requirements to avoid aesthetic or other conflicts with the design and function of the balance of the Building. Landlord’s approval is solely given for the benefit of Landlord, and neither Tenant nor any third party shall have the right to rely upon Landlord’s approval of Tenant’s plans for any purpose whatsoever other than that Landlord does not object thereto under this Lease. Landlord’s architects and engineers shall respond (with approval or disapproval) to any plan submission by Tenant within 8 business days after Landlord’s receipt thereof. If Landlord fails to respond to any such submission within such 8 business day period, which failure continues for more than 2 business days after Tenant gives Landlord a written notice (the “Deemed Approved Notice”) advising Landlord that such plan submission shall be deemed approved within 2 business days of Landlord’s receipt of the Deemed Approved Notice, then such plan submission shall be deemed approved hereunder. The Deemed Approved Notice shall, in order to be effective, contain on the first page thereof, in a font at least twice as large as the font of any other text contained in such notice, a legend substantially as follows: “FAILURE TO RESPOND TO THIS NOTICE WITHIN TWO (2) BUSINESS DAYS AFTER RECEIPT HEREOF SHALL CONSTITUTE LANDLORD’S APPROVAL OF SUBMITTED PLANS.” In the event Landlord’s architect’s or engineers’ approval of Tenant’s plans is withheld or conditioned, Landlord shall send prompt written notification thereof to Tenant and include a reasonably detailed statement identifying the reasons for such refusal or condition, and Tenant shall promptly have the plans revised by its architect to incorporate all reasonable objections and conditions presented by Landlord and shall resubmit such plans to Landlord. Landlord’s architects and engineers shall respond (with approval or disapproval) to any plan re-submission by Tenant within 8 business days after Landlord’s receipt thereof. Such process shall be followed until the plans shall have been approved by Landlord’s architect and engineers without unreasonable objection or condition. Without limiting the foregoing, Tenant shall be responsible for all elements of the design of Tenant’s plans (including, without limitation, compliance with law, functionality of design, the structural integrity of the design, the configuration of the Premises and the placement of Tenant’s furniture, appliances and equipment), and Landlord’s approval of Tenant’s plans shall in no event relieve Tenant of the responsibility for such design. Tenant agrees it shall be solely responsible for the timely preparation and submission of all such plans and for all elements of the design of such plans and for all costs related thereto. (The word “architect” as used in this Section 3.2 shall include an interior designer or space planner.) Tenant shall reimburse Landlord Landlord’s reasonable out-of-pocket expense incurred in connection with the review of Tenant’s plans.

  • Sub-Adviser Review of Materials Upon the Adviser’s request, the Sub-Adviser shall review and comment upon selected portions, relating to the Sub-Adviser and/or Strategy (including the Allocated Portion), of the Registration Statement, other offering documents and ancillary sales and marketing materials prepared by the Adviser for the Fund, and participate, at the reasonable request of the Adviser and as agreed to by the Sub-Adviser, in educational meetings with placement agents and other intermediaries about portfolio management and investment-related matters of the Fund. The Sub-Adviser will promptly inform the Fund and the Adviser if any information in the Registration Statement is (or will become) inaccurate or incomplete.

  • Construction Schedule 5.1 Coordination:

  • Project Description The Project Description may be changed from time to time by, or with the consent of, the Company provided that any such change shall also be filed with the Issuer and provided further that no change in the Project Description shall materially change the function of the Project Facilities unless the Trustee shall have received (i) an Engineer's certificate that such changes will not impair the significance or character of the Project Facilities as Pollution Control Facilities and (ii) an Opinion of Bond Counsel or ruling of the Internal Revenue Service to the effect that such amendment will not adversely affect the exclusion of interest on the Bonds from gross income for federal income tax purposes.

  • Communications with Potential Business Combination Targets Prior to the date hereof, neither the Company nor anyone on its behalf has, and as of the First Closing Date, neither the Company nor anyone on its behalf will have selected any Business Combination target or initiated any substantive discussions, directly or indirectly, with any Business Combination target.

  • Auction Schedule The Auction Agent shall conduct Auctions in accordance with the schedule set forth below. Such schedule may be changed by the Auction Agent with the consent of the Company, which consent shall not be withheld unreasonably. The Auction Agent shall give notice of any such change to each Broker-Dealer. Such notice shall be received prior to the first Auction Date on which any such change shall be effective. Time Event ---- ----- By 9:30 A.M. Auction Agent advises the Company and the Broker-Dealers of the Reference Rate and the Maximum Applicable Rate as set forth in Section 2.2(e)(i) hereof.

Time is Money Join Law Insider Premium to draft better contracts faster.