Proposed Maintenance Manual Sample Clauses

Proposed Maintenance Manual. (a) At least 3 months prior to the Anticipated Commencement Date, the Contractor must prepare and submit to the Principal, for approval, a maintenance manual which sets out a detailed programme for the:
AutoNDA by SimpleDocs

Related to Proposed Maintenance Manual

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.

  • Operating and Maintenance Manuals 58.1 If “as built” Drawings and/or operating and maintenance manuals are required, the Contractor shall supply them by the dates stated in the Contract Data.

  • Maintenance Scheduling The NTO shall schedule maintenance of its facilities designated as NTO Transmission Facilities Under ISO Operational Control and schedule any outages (other than forced transmission outages) of said transmission system facilities in accordance with outage schedules approved by the ISO. The NTO shall comply with maintenance schedules coordinated by the ISO, pursuant to this Agreement, for NTO Transmission Facilities Under ISO Operational Control. The NTO shall be responsible for providing notification of maintenance schedules to the ISO for NTO Transmission Facilities Requiring ISO Notification. The NTO shall provide notification of maintenance schedules to affected Transmission Owners for NTO Transmission Facilities Requiring ISO Notification and Local Area Transmission Facilities pursuant to Section 3.5.3 of the ISO Services Tariff.

  • Planned Maintenance (a) Sellers may designate up to twenty (20) Days of Planned Maintenance on Sellers’ Facilities during each Contract Year. Sellers shall be entitled to reduce (including down to zero (0)) its Gas scheduling under Clause 8 and Exhibit 3 for each Day of Planned Maintenance.

  • TECHNICAL SUPPORT AND MAINTENANCE If technical support and maintenance is a part of the Goods that Contractor provides under the Contract, Contractor will use commercially reasonable efforts to respond to the Department in a reasonable time when the Department makes technical support or maintenance requests regarding the Goods.

  • SYSTEM CHANGES AND MAINTENANCE/SUPPORT The Contractor shall give a minimum of 5 business days advance Written notice to the designated Authorized User contact of any upgrades, system changes and Maintenance/support actions that may potentially impact services described in the Authorized User Agreement. Upgrades, system changes, and Maintenance/support actions which are required by system vulnerabilities or emergency situations shall be carried out by the Contractor to protect the system. Authorized Users shall be notified by the Contractor as soon as possible after the change has taken place. Contractor shall provide documentation of upgrades, system changes and Maintenance/support actions upon request from an Authorized User. EXPIRATION, TERMINATION OR SUSPENSION OF SERVICES Return of Data The Contractor shall return Data in a format agreed upon within the Authorized User Agreement or as agreed to with the Authorized User. This can, if specified within the Authorized User Agreement, be carried out by providing application programmable interface or other such efficient electronic tools. The Contractor must certify all Data has been removed from its system and removed from backups within timeframes established in the Authorized User Agreement or as agreed to with the Authorized User. Suspension of Services During any period of suspension of service, the Authorized User shall have full access to all Data at no charge. This can, if specified within the Authorized User Agreement, be carried out by providing an application programmable interface or other such efficient electronic tools. The Contractor shall not take any action to erase and/or withhold any Authorized User Data, except as directed by the Authorized User. Expiration or Termination of Services Upon expiration or termination of an Authorized User Agreement, the Authorized User shall have full access to all Data for a period of 60 calendar days. Unless noted in the original Authorized User Agreement, this period will be covered at no charge. This can, if specified within the Authorized User Agreement, be carried out by providing application programmable interface or other such efficient electronic tools. During this period, the Contractor shall not take any action to erase and/or withhold any Data, except as directed by the Authorized User. An Authorized User shall have the right to specify a period in excess of 60 calendar days in its RFQ. SECURE DATA DISPOSAL When requested by the Authorized User, the Contractor shall destroy Data in all of its forms, including all back-ups. Data shall be permanently deleted and shall not be recoverable, according ITS Policy S13-003 Sanitization/Secure Disposal or successor and S14-003 Information Security Controls or successor. Certificates of destruction, in a form acceptable to the Authorized User, shall be provided by the Contractor to the Authorized User.

  • Support and Maintenance Services Information about Teradici’s support and maintenance for the Licensed Product may be found at xxxxx://xxxx.xxxxxxxx.xxx.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.