Proposed test procedures Sample Clauses

Proposed test procedures for all Completion Testing will be prepared by Contractor in cooperation with CUC and submitted to CUC for final approval at least one hundred eighty (180) Days prior to the anticipated scheduled start of Completion Testing.
AutoNDA by SimpleDocs

Related to Proposed test procedures

  • Test Procedures For an Asset Review, the Asset Representations Reviewer will perform for each Asset Review Receivable the procedures listed under “Procedures to be Performed” in Schedule A for each representation and warranty (each, a “Test”), using the Asset Review Materials listed for each such Test in Schedule A. For each Test and Asset Review Receivable, the Asset Representations Reviewer will determine if the Test has been satisfied (a “Test Pass”) or if the Test has not been satisfied (a “Test Fail”).

  • Test procedure The engine speed shall be gradually increased from idle to the target engine speed, not exceeding the tolerance band of ±3 per cent of the target engine speed, and held constant. Then the throttle control shall be rapidly released and the engine speed shall be returned to idle. The sound pressure level shall be measured during a period of operation consisting of a maintaining constant engine speed of 1 second and throughout the entire deceleration period. The maximum sound level meter reading during this period of operation, mathematically rounded to the first decimal place, is taken as the test value.

  • New Procedures New procedures as to who shall provide certain of these services in Section 1 may be established in writing from time to time by agreement between the Fund and the Transfer Agent. The Transfer Agent may at times perform only a portion of these services and the Fund or its agent may perform these services on the Fund's behalf;

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will xxxx Xxxxxxx Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • AUDIT REVIEW PROCEDURES Any dispute concerning a question of fact arising under an interim or post audit of this AGREEMENT that is not disposed of by agreement, shall be reviewed by ALAMEDA CTC’s Deputy Executive Director of Finance and Administration. Not later than thirty (30) calendar days after issuance of the final audit report, CONSULTANT may request a review by ALAMEDA CTC’s Deputy Executive Director of Finance and Administration of unresolved audit issues. The request for review will be submitted in writing. Neither the pendency of a dispute nor its consideration by ALAMEDA CTC will excuse CONSULTANT from full and timely performance, in accordance with the terms of this AGREEMENT. CONSULTANT and subconsultants’ contracts, including cost proposals and ICRs, may be subject to audits or reviews such as, but not limited to, an AGREEMENT Audit, an Incurred Cost Audit, an ICR Audit, or a certified public accountant (“CPA”) ICR Audit Workpaper Review. If selected for audit or review, the AGREEMENT, cost proposal and ICR and related workpapers, if applicable, will be reviewed to verify compliance with 48 CFR, Chapter 1, Part 31 and other related laws and regulations. In the instances of a CPA ICR Audit Workpaper Review it is CONSULTANT’s responsibility to ensure federal, state, or local government officials are allowed full access to the CPA’s workpapers including making copies as necessary. The AGREEMENT, cost proposal, and ICR shall be adjusted by CONSULTANT and approved by ALAMEDA CTC to conform to the audit or review recommendations. CONSULTANT agrees that individual terms of costs identified in the audit report shall be incorporated into the contract by this reference if directed by ALAMEDA CTC at its sole discretion. Refusal by CONSULTANT to incorporate audit or review recommendations, or to ensure that the federal, state, or local governments have access to CPA workpapers, will be considered a breach of contract terms and cause for termination of the AGREEMENT and disallowance of prior reimbursed costs.

  • Review Procedures a. In consultation with the Illinois SHPO, NRCS shall identify those undertakings with little to no potential to affect historic properties and list those undertakings in Appendix A. Upon the determination by the CRS that a proposed undertaking is included in Appendix A, the NRCS is not required to consult further with the SHPO for that undertaking. A list of undertakings with the potential to affect historic properties comprises Appendix B. b. The lists of undertakings provided in Appendices A and B may be modified through consultation and written agreement between the NRCS State Conservationist and the SHPO without requiring an amendment to this Illinois Prototype Agreement. The NRCS State Office will maintain the master list and will provide an updated list to all consulting parties with an explanation of the rationale for classifying the practices accordingly. c. Undertakings identified in Appendix B shall require further review as outlined in Stipulation V. a. The NRCS shall consult with the SHPO to define the undertaking’s APE, identify and evaluate historic properties that may be affected by the undertaking, assess potential effects, and identify strategies for resolving adverse effects prior to implementing the undertaking. 1) NRCS may provide its proposed APE, identification of historic properties and/or scope of identification efforts, and assessment of effects in a single transmittal to the SHPO, provided this documentation meets the substantive standards in 36 CFR Part 800.4-5 and 800.11. 2) The NRCS shall attempt to avoid adverse effects to historic properties whenever possible; where historic properties are located in the APE, NRCS shall describe how it proposes to modify, buffer, or move the undertaking to avoid adverse effects to historic properties. 3) Where the NRCS proposes a finding of "no historic properties affected" or "no adverse effect" to historic properties, the SHPO shall have 30 calendar days from receipt of this documented description and information to review it and provide comments. The NRCS shall take into account all timely comments. i. If the SHPO, or another consulting party, disagrees with NRCS' findings and/or determination, it shall notify the NRCS within the thirty (30) calendar daytime period. The NRCS shall consult with the SHPO or other consulting party to attempt to resolve the disagreement. If the disagreement cannot be resolved through this consultation, NRCS shall follow the dispute resolution process in Stipulation VIII below. ii. If the SHPO does not respond to the NRCS within the thirty (30) calendar day period and/or the NRCS receives no objections from other consulting parties, or if the SHPO concurs with the NRCS' determination and proposed actions to avoid adverse effects, the NRCS shall document the concurrence/lack of response within the review time noted above and may move forward with the undertaking. 4) Where a proposed undertaking may adversely affect historic properties, NRCS shall describe proposed measures to minimize or mitigate the adverse effects, and follow the process in 36 CFR Part 800.6, including consultation with other consulting patties and notification to the ACHP, to develop a Memorandum of Agreement to resolve the adverse effects. Should the proposed undertaking have the potential to adversely affect a known NHL, the NRCS shall, to the maximum extent possible, undertake such planning and actions that may be necessary to minimize harm to the NHL in accordance with 54 U.S.C. § 306107 of the NHPA and 36 CFR Part 800.6 and 800.10, including consultation with the ACHP and respective National Park Service, Regional National Historic Landmark Program Coordinator, to develop a Memorandum of Agreement. d. NRCS will conduct archaeological surveys and will submit reports and other documentation to SHPO for review and comment. When no archaeological sites have been located by the archaeological survey, NRCS may proceed with the proposed undertaking. Reports for negative surveys must be submitted to SHPO on a quarterly basis. All positive and negative reports submitted to SHPO will be sent digitally for submission to the Inventory of Illinois Archaeological Sites (IAS) data file maintained by staff at the Illinois State Museum (ISM) housed under the Illinois Department of Natural Resources (IDNR). The NRCS further agrees that access to specific site location data will be restricted to the CRS, the NRCS field personnel installing conservation practices adjacent to the cultural resource, and the landowner. Specific site location information for individual projects will be maintained in a secure cultural resources file kept in the field offices and will not be available to the public. e. Curation: NRCS personnel will not collect artifactual material during routine field inspections. However, if a professional survey, evaluation testing, or mitigation is required, NRCS shall ensure that all materials and records resulting from cultural resources surveys or data recovery activities on federal or state property are curated by the Illinois State Museum. The NRCS shall ensure that all records resulting from cultural resource surveys or data recovery activities on private property are curated by the Illinois State Museum or an equivalent curation facility in accordance with 36 CFR Part 79. Subject to the landowner's permission, all objects resulting from cultural resources surveys or data recovery activities are maintained by the Illinois State Museum or equivalent research institution until their analysis is complete and they are returned to their owner(s). Although landowners will be encouraged to donate artifactual material, it is understood that objects collected on private land remain the property of the landowner(s) unless the landowner(s) donates the material to the Illinois State Museum or equivalent research institution. This excludes burial goods, as stipulated by XXXXXX.

  • Procurement procedures 11.1 The Recipient must secure the best value for money and shall act in a fair, open and non-discriminatory manner in all purchases of goods and services.

  • Conformity Assessment Procedures 1. Each Party shall give positive consideration to accepting the results of conformity assessment procedures of other Parties, even where those procedures differ from its own, provided it is satisfied that those procedures offer an assurance of conformity with applicable technical regulations or standards equivalent to its own procedures. 2. Each Party shall seek to enhance the acceptance of the results of conformity assessment procedures conducted in the territories of other Parties with a view to increasing efficiency, avoiding duplication and ensuring cost effectiveness of the conformity assessments. In this regard, each Party may choose, depending on the situation of the Party and the specific sectors involved, a broad range of approaches. These may include but are not limited to: (a) recognition by a Party of the results of conformity assessments performed in the territory of another Party; (b) recognition of co-operative arrangements between accreditation bodies in the territories of the Parties; (c) mutual recognition of conformity assessment procedures conducted by bodies located in the territory of each Party; (d) accreditation of conformity assessment bodies in the territory of another Party; (e) use of existing regional and international multilateral recognition agreements and arrangements; (f) designating conformity assessment bodies located in the territory of another Party to perform conformity assessment; and (g) suppliers’ declaration of conformity. 3. Each Party shall exchange information with other Parties on its experience in the development and application of the approaches in Paragraph 2(a) to (g) and other appropriate approaches with a view to facilitating the acceptance of the results of conformity assessment procedures. 4. A Party shall, upon request of another Party, explain its reasons for not accepting the results of any conformity assessment procedure performed in the territory of that other Party.

  • Reply Procedures In connection with any Auction, each Lender holding the relevant Term Loans subject to such Auction may, in its sole discretion, participate in such Auction and may provide the Auction Agent with a notice of participation (the “Return Bid”) which shall be in a form reasonably acceptable to the Auction Agent, and shall specify (i) a discount to par (that must be expressed as a price at which it is willing to sell all or any portion of such Term Loans) (the “Reply Price”), which (when expressed as a percentage of the par principal amount of such Term Loans) must be within the Discount Range and (ii) a principal amount of such Term Loans, which must be in whole increments of $1,000,000 (or, in any case, such lesser amount of such Term Loans of such Lender then outstanding or which is otherwise reasonably acceptable to the Auction Agent) (the “Reply Amount”). Lenders may only submit one Return Bid per Auction, but each Return Bid may contain up to three bids only one of which may result in a Qualifying Bid. In addition to the Return Bid, the participating Lender must execute and deliver, to be held in escrow by the Auction Agent, an Assignment and Assumption with the dollar amount of the Term Loans to be assigned to be left in blank, which amount shall be completed by the Auction Agent in accordance with the final determination of such Lender’s Qualifying Bid pursuant to clause (c) below. Any Lender whose Return Bid is not received by the Auction Agent by the Auction Response Date shall be deemed to have declined to participate in the relevant Auction with respect to all of its Term Loans.

  • Testing Procedures Testing will be conducted by an outside certified Agency in such a way to ensure maximum accuracy and reliability by using the techniques, chain of custody procedures, equipment and laboratory facilities which have been approved by the U.S. Department of Health and Human Services. All employees notified of a positive controlled substance or alcohol test result may request an independent test of their split sample at the employee’s expense. If the test result is negative the Employer will reimburse the employee for the cost of the split sample test.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!