Common use of RECORD OF WORK DONE Clause in Contracts

RECORD OF WORK DONE. D.5.1. The Contractor shall maintain an accurate record of the Work performed during the term of the Contract. If the Work includes any changes or corrections from the documents provided by NYCDOT, the Contractor shall create and maintain revised record drawings reflecting such changes or corrections. Record drawings shall preferably be the same size as the Contract Drawings, or as directed by XXXXXX.

Appears in 5 contracts

Samples: a856-cityrecord.nyc.gov, a856-cityrecord.nyc.gov, a856-cityrecord.nyc.gov

AutoNDA by SimpleDocs

RECORD OF WORK DONE. D.5.1. The Contractor shall maintain an accurate record of the Work performed during the term of the Contract. If the Work includes any changes or corrections from the documents provided by NYCDOT, the Contractor shall create and maintain revised record drawings reflecting such changes or corrections. Record drawings shall preferably be the same size as the Contract Drawings, or as directed by XXXXXX. The Contractor’s attention is particularly directed to the necessity of keeping accurate records of all subsurface and concealed work so that the record drawings may contain this information in exact detail and location.

Appears in 3 contracts

Samples: a856-cityrecord.nyc.gov, a856-cityrecord.nyc.gov, a856-cityrecord.nyc.gov

AutoNDA by SimpleDocs

RECORD OF WORK DONE. D.5.1D.4.1. The Contractor shall maintain an accurate record of the Work performed during the term of the Contract. If the Work includes any changes or corrections from the documents provided by NYCDOT, the Contractor shall create and maintain revised record drawings reflecting such changes or corrections. Record drawings shall preferably be the same size as the Contract Drawings, or as directed by XXXXXX.

Appears in 1 contract

Samples: movablebridgeresource.com

Time is Money Join Law Insider Premium to draft better contracts faster.