General Project Description. Substation location.
General Project Description. The Project Title, Project Code, Work Order #, and Project # indicated above are required to be shown for identification purposes on all project related material and documents including, but not limited to, Notices, Change Orders, Submittals, Requests For Information, Requests For Quotes, Field Orders, minutes of meetings, correspondence, Schedule of Values and Certificate For Payment (e-Builder H-12 process), test reports, and related materials.
General Project Description. The County in cooperation with the County Weed and Pest Board will furnish all labor, equipment, transportation, technical aid and supervision necessary to perform noxious weed control on approximately 76 acres on the Black Hills National Forest within Xxxxxxxx County. Contact the Forest Service Program Manager for locations and maps. In consideration of the above premises, the parties agree as follows:
General Project Description. Line route description
General Project Description. In consideration of the above premises, the parties agree as follows:
General Project Description. The general Project description depicted in this annex has been prepared on the basis of a preliminary engineering project and not on Definitive Engineering, so that the final characteristics, details and basic specifications of the Project equipment to be constructed will be those approved by the COES in the Pre-Operative Study. This study aims at determining and evaluating the new facility impact on SEIN's operation, on the Transmission System capacity, and on the reliability and quality of its operations. The proposal developed in the Project Definitive Engineering must comply and agree with the approved Preoperative Study. Likewise, the Concessionaire will be responsible for including other elements or components not described in this Annex, required for the project functioning and operation, as well as for modifying or adapting what is necessary, and establish its definitive characteristics, to guarantee correct operation of all its facilities and service provision in compliance with standards in the National Interconnected Electrical System (SEIN). In the event that Project scope, specifications or characteristics contained in this Annex differ to that specified in the preliminary engineering plan, the provisions of this Annex shall prevail. In that regard, the preliminary engineering draft should be considered as a document with referential information. Design criteria used in developing the project shall be consistent with the existing facilities and with the design criteria established in Technical Procedure COES PR-20 "Entry, Modification and Removal of Facilities in the SEIN" and with the requirements of the National Electricity Code CNE- Supply and CNE-Utilization, as well as other standards specified in the annex herein, in force at the date of signing the agreement. The General Project Outlook shown in Scheme 1 (at the end of this Annex) comprises the following facilities:
a) National Transmission System: • Mantaro Nueva (Colcabamba) - Nueva Yanango 500 kV transmission line (L.T.), in simple circuit, approximately 179 km in length. • Nueva Yanango - Carapongo 500 kV transmission line (L.T.), in simple circuit, approximately 211 km in length. • Expansion of the 500/220 kV Colcabamba substation • Nueva Yanango 500/220 kV Substation • Expansion of the 500/220 kV Carapongo substation
b) Local Transmission System: • Expansion of the Yanango 220 kV substation • 220 kV link between existing Yanango and Nueva Yanango substations, consisting of a simp...
General Project Description. Provide construction management for the Services Phase(s) of the Project for the purpose and to the extent set forth in the CM Contract (the "Project"). (Instructions: pick the phase-appropriate language below, complete the material if necessary, then delete these instructions and the other, non-applicable material.)
General Project Description. This Contract is for the maintenance in good condition and proper working order of all street lighting devices within the area covered by this contract, whose maintenance is a responsibility of the Department.
General Project Description. The Parties contemplate that the Research Program will include the following steps and activities:
(a) DPC will furnish to 3DP the structure and activity data on chemical compounds screened against a Target, including both compounds that are active ("Hits") and compounds that are inactive against the Target.
(b) 3DP will use its DirectedDiversity? Technology to compute a chemical descriptor matrix to describe and map the compounds for which DPC provides data. 3DP also will develop a Structure Activity Relationship ("SAR") model based on this descriptor matrix for Hits.
(c) 3DP will compare the SAR model with compounds in 3DP Accessible Libraries, and 3DP will identify [**] compounds to be synthesized by 3DP and supplied to DPC for testing. 3DP will supply between [**] milligrams of each such compound in 96 deep well plates (about 80 compounds per plate). These compounds will meet a minimum purity of [**] of the compounds provided. Upon request of DPC, 3DP will provide additional quality control for individual compounds.
(d) 3DP will provide DPC with a secure internet based communication channel to provide activity or other compound related data to 3DP.
(e) 3DP will develop an improved SAR model based on the testing data provided by DPC. This improved SAR will be used to perform iterative rounds of selection and synthesis of compounds from 3DP Accessible Libraries, and/or to develop Custom Accessible Libraries from which compounds will be selected and synthesized, and/or to perform preliminary medicinal chemistry optimization and synthesis. Such compounds will be supplied to DPC for additional testing in furtherance of the Research Program.
General Project Description. This Contract is for the maintenance of all NYCDOT street lighting devices set forth in the Bid Sheet (hereinafter referred to as the “Device(s)”) within the Borough of Manhattan, Maintenance Area No.
1. The Contractor shall maintain the Devices in good condition and proper working order, and shall provide prompt repairs during the Contractor's patrol and pursuant to the work orders from NYCDOT.