Repair Method No Sample Clauses

Repair Method No. 1 (24 Hour Accelerated Strength Concrete) After the repair area preparation is complete, completely coat all concrete surfaces within the repair area with a film of Type II epoxy at a thickness of 10 to 20 mils (0.25 to 0.50mm). Use concrete that meets the requirements of Section 504. Mix the concrete on site. Use a mix design and mixing method approved by the Laboratory. Deposit concrete in the repair area while the epoxy is still tacky and vibrate sufficiently to form a dense, homogeneous mass of concrete, completely filling the area of the patch. Screed the concrete to the proper grade and allow to remain undisturbed until the water sheen disappears from the surface. Then cover the concrete with wet burlap or membrane curing compound. Ensure that curing continues for a minimum of 3 hours. The Engineer may require a longer curing time to ensure sufficient strength development of the concrete prior to opening to traffic.
AutoNDA by SimpleDocs
Repair Method No. 2 (Rapid Setting Patching Material) Follow the above requirements for Repair Method No. 1. Additionally, prepare the surfaces in the repair areas in accordance with the manufacturer’s written recommendations. Ensure that handling, mixing, placement, consolidation, screeding, and curing of the patching material are in accordance with the manufacturer’s written instructions as approved by the Laboratory. Ensure that curing continues for at least one hour and until the section is opened to traffic.

Related to Repair Method No

  • Test method 3.3.1. The method used shall be that described in Annex 3, paragraph 3.1.

  • Repair Testing At the time of repair of a LIS trunk group, at no additional charge, tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Payment Methodology The Contractor shall be compensated based on the Service Rates in Attachment for units of service authorized by the Institution in a total amount not to exceed the Contract Maximum Liability established in Section C.1. The Contractor’s compensation shall be contingent upon the satisfactory completion of units of service or project milestones identified in Attachment B. The Contractor shall submit invoices, in form and substance acceptable to the Institution with all of the necessary supporting documentation, prior to any payment. Such invoices shall be submitted for completed units of service or project milestones for the amount stipulated.

  • Measurement method An isolation resistance test instrument is connected between the live parts and the electrical chassis. The isolation resistance is subsequently measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in conductively connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those components disconnected.

  • Procurement Method (a) Quality-Based Selection (b) Selection under a Fixed Budget

  • Payment Methods A. Except as otherwise provided by this Contract, the payment method will be one or more of the following:

  • ICE Method The method used to calculate One-Month LIBOR, as described in Section 3.05.

  • Repair or Replacement (1) Unless a dispute resolution process has been initiated, the Insurer, instead of making payment, may repair, rebuild, or replace the insured property lost or damaged, on giving written notice of its intention to do so within thirty days after receiving the proof of loss.

  • GOODS RE-ENTERED AFTER REPAIR OR ALTERATION 1. No Party may apply a customs duty to a good, regardless of its origin, that re-enters its territory after that good has been temporarily exported from its territory to the territory of another Party for repair or alteration, regardless of whether such repair or alteration could be performed in the territory of the Party from which the good was exported for repair or alteration.

  • RECONNECTION AFTER DISCONNECTION (a) We must request your distributor to reconnect your premises if, within 10 business days of your premises being disconnected:

Time is Money Join Law Insider Premium to draft better contracts faster.