Construction Layout. THE SEVENTH PARAGRAPH IS CHANGED TO: Provide the Utilities with the layout needed to install relocated utility facilities and coordinate the Work. Ensure that relocated facilities do not conflict with proposed construction, including High Voltage Proximity Act conflicts. THE FOLLOWING IS ADDED AFTER THE NINTH PARAGRAPH: For each bridge and sign structure within the Project Limits, provide the RE as-built measurements of the vertical under clearance at each lane line, shoulder line, curb line and edge of pavement line under a structure to the nearest inch. For each bridge structure, provide vertical under clearance measurements at each fascia beam.
Construction Layout. The Contractor will be responsible for the Construction Layout of the project under the direction of the Engineer. This work will be covered under Section 149 of the Georgia Department of Transportation’s Standard Specifications Construction of Transportation System, Current Edition. The Construction Layout shall include, but is not limited to grade staking, alignment staking, and right of way staking.
Construction Layout. A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify Architect promptly.
Construction Layout. Job Order Contractor shall lay out its Work in accordance with the Contract plans and specifications and shall be responsible for all measurements in connection with the layout of the Work. Job Order Contractor shall furnish, at its own expense, all stakes, templates, platforms, equipment, tools, materials and labor required to layout any part of the Work. Job Order Contractor shall also be responsible for maintaining and preserving all control points established by the City Representative.
Construction Layout. Horizontal and vertical measurements for construction.
Construction Layout. If requested by the Owner, or other authorized party, as detailed in the scope of services or as an Additional Service to this Agreement, the PROFESSIONAL shall provide construction layout stakes sufficient for construction purposes. The stakes will reflect pertinent information from the construction bidding and contract documents. The stakes shall be set in place one time by the PROFESSIONAL, staged and scheduled as requested by the Contractor. After the stakes are set, it shall be the Contractor’s exclusive responsibility to protect the stakes from damage or removal. Once the stake is set, if the stake becomes unusable due to the Contractor’s negligence it shall be reset by the PROFESSIONAL, only at the Contractor’s direction. The cost for resetting the stakes shall be borne by the Contractor and shall be paid by the Owner or authorized representative of this Agreement to the PROFESSIONAL from monies due the Contractor from the construction contract. The Owner acknowledges and agrees that these staking requirements and the procedures and payments for restaking described in this section shall be stipulated in the General Conditions of the construction contract.
Construction Layout. In addition to the conditions stipulated in the Niagara Peninsula Standard Contract Document, the following shall also apply. Included in the cost of this item: the checking of all grades and alignment, re- staking of layout due to destruction or removals; any additional layout within the intent of the contract for minor revisions to the road, sidewalk, water or sewer design etc. SPSCI-4a Item 1.4 SPCD-A8 ALLOWANCE FOR CONSTRUCTION SIGNS, TRAFFIC CONTROL, AND TRAFFIC MANAGEMENT PLAN In addition to the conditions stipulated in the Niagara Peninsula Standard Contract Document, the following shall also apply. In addition to the Traffic Protection Plan required under the O.H.S.A., O.T.M. Book 7 and the M.O.L., paid for under the Contract Items, the Contractor shall be responsible for the preparation of a traffic management plan, to be provided to the Contract Administrator for review, within seven (7) days of the contract award. It shall conform to all necessary regulations. This plan shall have details for the following requirements but shall not be limited to: traffic flows with regards to work schedule traffic management during peak traffic flows maximum delay time number of flagpersons and communication devices ( minimum two) THESE DOCUMENTS AVAILABLE FOR PURCHASE AT CITY HALL Contract rates shall include for traffic control flagging throughout the duration of the project and in accordance with the Manual of Uniform Traffic Control Devices and the requirements of the Construction Safety Association of Ontario. The contractor shall stage his operations to ensure that one lane of traffic remains open at all times. Vehicular and pedestrian access to all businesses, homes and side streets must be maintained at all times. No road closures will be allowed, unless approved by the Contract Administrator. Co-ordination and co-operation from the contractor will be required to ensure minimum disruption during all phases of construction. The contractor is responsible for the installation and removal of all construction signage and daily maintenance of all signs throughout the duration of the contract. It shall be the responsibility of the Contractor to notify Emergency Services, the Niagara Region (for household waste and recycling pick up), any school boards which may be affected, when necessary, as to the current status of construction as it pertains to safe passage of traffic within the construction limits. SPSCI-4b Item 1.5 ALLOWANCE FOR CONSTRUCTION SCHEDULE, AND...
Construction Layout o Provide surveying services for the placement of the proposed improvements. Surveying stakes will be placed along the edge of the road and include proposed grades for the contractor to build to.
Construction Layout. A. General: Engage a land surveyor to lay out the Work using accepted surveying practices.
Construction Layout. | Provide surveying layout services for the improvements reflected in the construction documents prepared by Xxxxxxx Xxxxxxx and HAA. One set of line and grade stakes will be set for each improvement based on being staked one construction operation at a time and in an organized construction sequence. In the event that any staking is destroyed by an act of God or parties other than the surveyor, the cost of re-staking shall be paid by the Client as additional services. Please note that construction layout services will also include in-house survey layout calculations. Staking sign locations, landscape plantings (except trees), irrigation systems, undercut measurement, volume calculations, grading certifications, replacement of damaged stakes and re-staking are not included. These are considered optional services to be contracted and paid for separately. NOTE: Final electronic CADD drawings will be required to be submitted to Xxxxxxx Xxxxxxx for improvements to be staked. The staking interval for each infrastructure system will be as follows: Schiffer Park