Reservation Method Alternatives Sample Clauses

Reservation Method Alternatives. The Contractor may offer up alternative reservation methods that may include electronic reservation methods. All alternative methods must be approved by the Contracting Officer.
AutoNDA by SimpleDocs

Related to Reservation Method Alternatives

  • Construction Methods 3.1 The Contractor shall provide all tools, equipment, materials, labor and work for the excavation and removal of the unsuitable subgrade soils and their subsequent replacement with the specified backfill soils as directed by the Owner’s representative. All work under this item shall be performed in a safe and workmanlike manner. 3.2 All work shall be performed in accordance with DelDOT Standard Specifications Section 821. 3.3 Following the removal of existing pavements, the Owner’s representative will review the exposed subgrade and provide recommendations for the undercutting of unsuitable subgrade materials as required. The depth and extent of undercut excavation, if required, will be determined by the Owner’s representative at the time of excavation. 3.4 All excavated materials shall become the property of the Contractor and be removed from the site at the completion of the project at no additional expense to the Owner. 3.5 Undercut excavations should be backfilled with graded aggregate. Backfill shall be placed in loose lifts not exceeding 8 inches thick. Each lift should be compacted with at least 3 passes of a minimum 5-ton, walk-behind or self-propelled vibratory roller when the size of the area permits, or with a vibrating plate mechanical compactor for smaller areas. Lift thickness shall be reduced to 6 inch loose lift when using a vibratory plate compactor. 3.6 The Contractor shall take precautions as necessary to minimize the potential for disturbance or softening of the pavement subgrade materials from inclement weather or construction traffic. As a minimum, this shall include the placement of backfill on the same day as the excavation. Any soft areas which develop shall be undercut and replaced with graded aggregate at no additional cost to the Owner. 3.7 Where undercutting is performed, the geotextile fabric shall be installed. The fabric should be pulled tight and lapped a minimum of 12 inches.

  • Method and Content The State shall notify Grantee of such termination in accordance with §16. The notice shall specify the effective date of the termination and whether it affects all or a portion of this Grant.

  • Second Method and Market Quotation If the Second Method and Market Quotation apply, an amount will be payable equal to (A) the sum of the Settlement Amount (determined by the Non-defaulting Party) in respect of the Terminated Transactions and the Termination Currency Equivalent of the Unpaid Amounts owing to the Non-defaulting Party less (B) the Termination Currency Equivalent of the Unpaid Amounts owing to the Defaulting Party. If that amount is a positive number, the Defaulting Party will pay it to the Non-defaulting Party; if it is a negative number, the Non-defaulting Party will pay the absolute value of that amount to the Defaulting Party.

  • Second Method and Loss If the Second Method and Loss apply, an amount will be payable equal to the Non-defaulting Party's Loss in respect of this Agreement. If that amount is a positive number, the Defaulting Party will pay it to the Non-defaulting Party; if it is a negative number, the Non-defaulting Party will pay the absolute value of that amount to the Defaulting Party.

  • First Method and Market Quotation If the First Method and Market Quotation apply, the Defaulting Party will pay to the Non-defaulting Party the excess, if a positive number, of (A) the sum of the Settlement Amount (determined by the Non-defaulting Party) in respect of the Terminated Transactions and the Termination Currency Equivalent of the Unpaid Amounts owing to the Non-defaulting Party over (B) the Termination Currency Equivalent of the Unpaid Amounts owing to the Defaulting Party.

  • First Method and Loss If the First Method and Loss apply, the Defaulting Party will pay to the Non-defaulting Party, if a positive number, the Non-defaulting Party's Loss in respect of this Agreement.

  • Procurement Method Quality-Based Selection (b) Selection under a Fixed Budget

  • Loss Mitigation and Consideration of Alternatives (i) For each Single Family Shared-Loss Loan in default or for which a default is reasonably foreseeable, the Assuming Institution shall undertake reasonable and customary loss mitigation efforts, in accordance with any of the following programs selected by Assuming Institution in its sole discretion, Exhibit 5 (FDIC Mortgage Loan Modification Program), the United States Treasury's Home Affordable Modification Program Guidelines or any other modification program approved by the United States Treasury Department, the Corporation, the Board of Governors of the Federal Reserve System or any other governmental agency (it being understood that the Assuming Institution can select different programs for the various Single Family Shared-Loss Loans) (such program chosen, the “Modification Guidelines”). After selecting the applicable Modification Guideline for each such Single Family Shared-Loss Loan, the Assuming Institution shall document its consideration of foreclosure, loan restructuring under the applicable Modification Guideline chosen, and short-sale (if short-sale is a viable option) alternatives and shall select the alternative the Assuming Institution believes, based on its estimated calculations, will result in the least Loss. If unemployment or underemployment is the primary cause for default or for which a default is reasonably foreseeable, the Assuming Institution may consider the borrower for a temporary forbearance plan which reduces the loan payment to an affordable level for at least six (6) months. (ii) Losses on Home Equity Loans shall be shared under the charge-off policies of the Assuming Institution’s Examination Criteria as if they were Single Family Shared-Loss Loans. (iii) Losses on Investor-Owned Residential Loans shall be treated as Restructured Loans, and with the consent of the Receiver can be restructured under terms separate from the Exhibit 5 standards. Please refer to Exhibits 2(a)(1)-(2) for guidance in Calculation of Loss for Restructured Loans. Losses on Investor-Owned Residential Loans will be treated as if they were Single Family Shared-Loss Loans. (iv) The Assuming Institution shall retain its loss calculations for the Shared Loss Loans and such calculations shall be provided to the Receiver upon request. For the avoidance of doubt and notwithstanding anything herein to the contrary, (x) the Assuming Institution is not required to modify or restructure any Shared-Loss Loan on more than one occasion and (y) the Assuming Institution is not required to consider any alternatives with respect to any Shared-Loss Loan in the process of foreclosure as of the Bank Closing if the Assuming Institution can document that a loan modification is not cost effective and shall be entitled to continue such foreclosure measures and recover the Foreclosure Loss as provided herein, and (z) the Assuming Institution shall have a transition period of up to 90 days after Bank Closing to implement the Modification Guidelines, during which time, the Assuming Institution may submit claims under such guidelines as may be in place at the Failed Bank.

  • NETWORK INTERCONNECTION METHODS 3.1 The Interconnection provided herein may not be used solely for the purpose of originating a Party’s own interexchange traffic.

  • Alternative Tenders 12.1 Unless otherwise specified in the TDS, alternative Tenders shall not be considered.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!