Responsible Agency. Public Works When required: Prior to the establishment of use and the building opening to serve the public
Responsible Agency. The Agency designated within each RWMG to represent each Party to this Agreement.
Responsible Agency. All agencies When required: Prior to the establishment of use and the building opening to serve the public.
Responsible Agency. Planning When required: Prior to the establishment of use and the building opening to serve the public 61. The adopted Emerald Park Streetscape Design Guidelines for the current and former Alameda County Surplus Property Authority land (of which this parcel is a part) include design items that have not yet been integrated into the Project Landscape Plans. The Streetscape plans show a separated sidewalk along Xxxxxxx Drive and the Cinnamomum camphora (Camphor Tree) as the approved street tree. The Applicant/Developer will need to revise the Project Plans to show a separated sidewalk along the entirety of the Xxxxxxx Drive frontage. In the Emerald Park Streetscape Design Guidelines, a 13’ wide parkway strip is shown. However, Staff is willing to accept a smaller 6’ parkway strip between the street and the 6’ wide sidewalk in the interests of retaining as much of the adjacent berm and bio-swale as possible. In this strip, the approved street tree Cinnamomum camphora (Camphor Tree) shall be planted along with the appropriate groundcover. These modifications to the Project Plans shall be made before an encroachment permit can be issued. Responsible Agency: Planning When required: Prior to the issuance of an encroachment permit and prior to the establishment of use and the building opening to serve the public
Responsible Agency. Public Works When required: Prior to start of construction of the improvements in the right of way and prior to the building opening to the public.
Responsible Agency. Console System The console system links dispatch consoles to the System. When the console system is not functioning, dispatchers cannot communicate to subscribers over the System. This can be mitigated by use of consolettes or other radios as a backup. NOTE: The conventional channel gateway unit (CCGW) ties in conventional resources or disparate devices to a dispatch console. The ALMR Help Desk sends out bi-monthly reports when security patches are available. Consoles must be rebooted by the owning agency when notified of security updates by the Help Desk. See Appendix A, Table A.1.2 Responsibility of the site owning agency unless otherwise noted in Table A.1.1.2 Key Management Facility (KMF) The KMF system distributes keys over the air to enabled and authorized subscriber equipment. Failure of the KMF system may result in incompatible keys among subscriber units, preventing encrypted communication. A backup mechanism is manually keying the radios. Location: • Tudor Road Locations: • JBER • Eielson • FWA KMF costs include both operations and connectivity Monthly reboots are required ALMR contracted maintenance provider Responsibility of owning agency, as listed Network Management Terminals Network management terminals allow System Managers and Technicians to manage and control the System. NMT costs include both operations and connectivity Monthly reboots are required See Appendix A, Table A.1.2 Telephone Interconnect Telephone interconnect is an optional feature of the System that blends LMR and the PSTN into a single capability. This capability can be replaced by cellular or land-line telephones where coverage exists. Not a Critical Service Responsibility of the owning agency Responsibility of the owning agency Playback/Logging Recorders Logging recorders are installed to keep track of/record conversations for response and liability purposes. Any peripheral devices, such as an uninterrupted power source (UPS), are considered part of the logging system. Monthly reboots are required See Appendix A, Table A.1.2 Data Servers Data servers are computer software and hardware (a database platform) that provide supporting information and can performs task such as data analysis, storage, data manipulation, archiving, and other tasks using client/server architecture.i N/A Should be maintained per the manufacturer’s recommendations for maintenance and safety. This does not apply to third-party commercial providers; however, it is expected that they would have a defin...
Responsible Agency. CONTRACTOR:
Responsible Agency. Chula Vista shall be a “responsible agency” for the Project as that term is defined in Public Resources Code section 21069, and as used throughout CEQA and the CEQA Guidelines.
Responsible Agency. Console System The console system links dispatch consoles to the system. When the console system is not functioning, dispatchers cannot communicate to subscribers over the system. This can be mitigated by use of consolettes or other radios as a backup. NOTE: The conventional channel gateway unit (CCGW) ties in conventional resources or disparate devices to a dispatch console. The ALMR Help Desk sends out bi-monthly reports when security patches are available. Consoles must be rebooted by the owning agency when notified of security updates by the Help Desk. See Appendix A, Table A.1.2. Responsibility of the site owning agency unless otherwise noted in Table A.1.1.2.
Responsible Agency. The West Xxxxxxx Site #8 property has been approved by EPA for remedial action under the City’s Brownfields Cleanup Grant. The MDNR is providing the primary technical review as the site is currently enrolled in the MDNR B/VCP program.