Revision of Planned Outage Schedules Sample Clauses

Revision of Planned Outage Schedules. The Seller may amend the Planned Outage Schedule for any calendar year, either prior to or during such year, provided that it:
AutoNDA by SimpleDocs
Revision of Planned Outage Schedules. The Seller may amend the Planned Outage Schedule for any calendar year, either prior to or during such year, provided that it: (a) gives the Buyer as much advance notice as is reasonably practicable ahead the revised Planned Outage which is to be amended in the Planned Outage Schedule; and 6. Revisión del Programa de Interrupción Planificada: El Vendedor podrá modificar el Programa de Interrupción Planificada para cualquier año natural, ya sea antes o durante dicho año, siempre y cuando: (a) avise al Comprador con la mayor antelación posible de la Interrupción Planificada que se vaya a modificar en el Programa de Interrupción Planificada; y
Revision of Planned Outage Schedules. The Seller may amend the Planned Outage różnice pomiędzy prognozami a Zmierzoną Produkcją.

Related to Revision of Planned Outage Schedules

  • Outage Schedules The Connecting Transmission Owner shall post scheduled outages of its transmission facilities on the NYISO OASIS. Developer shall submit its planned maintenance schedules for the Large Generating Facility to Connecting Transmission Owner and NYISO for a minimum of a rolling thirty-six month period. Developer shall update its planned maintenance schedules as necessary. NYISO may direct, or the Connecting Transmission Owner may request, Developer to reschedule its maintenance as necessary to maintain the reliability of the New York State Transmission System. Compensation to Developer for any additional direct costs that the Developer incurs as a result of rescheduling maintenance, including any additional overtime, breaking of maintenance contracts or other costs above and beyond the cost the Developer would have incurred absent the request to reschedule maintenance, shall be in accordance with the NYISO OATT. Developer will not be eligible to receive compensation, if during the twelve (12) months prior to the date of the scheduled maintenance, the Developer had modified its schedule of maintenance activities other than at the direction of the NYISO or request of the Connecting Transmission Owner.

  • Voltage Schedules Once the Developer has synchronized the Large Generating Facility with the New York State Transmission System, NYISO shall require Developer to operate the Large Generating Facility to produce or absorb reactive power within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria). NYISO’s voltage schedules shall treat all sources of reactive power in the New York Control Area in an equitable and not unduly discriminatory manner. NYISO shall exercise Reasonable Efforts to provide Developer with such schedules in accordance with NYISO procedures, and may make changes to such schedules as necessary to maintain the reliability of the New York State Transmission System. Developer shall operate the Large Generating Facility to maintain the specified output voltage or power factor at the Point of Interconnection within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria) as directed by the Connecting Transmission Owner’s System Operator or the NYISO. If Developer is unable to maintain the specified voltage or power factor, it shall promptly notify NYISO.

  • Time Schedule 4.1. A project schedule is included in Appendix A.

  • Statement of Work The Contractor shall provide the services and staff, and otherwise do all things necessary for or incidental to the performance of work, as set forth below:

  • Flexible Work Schedules (a) Academic Professional staff members throughout the University may have, as indicated below, flexible work schedules. For example, Academic Professionals often travel on University business and/or work evenings and weekends. A flexible work schedule is defined as having established working hours different from the standard 8:00 a.m. to 5:00 p.m. Monday through Friday schedule, to be followed by an employee for an agreed upon period of time.

  • Work Schedules Workweeks and work shifts of different numbers of hours may be established by the Employer in order to meet business and customer service needs, as long as the work schedules meet federal and state laws.

  • Construction Schedules 10.1 Within seven (7) days of the University’s issuance of a purchase order, the Contractor shall submit to the Project Coordinator three (3) copies of a Construction Schedule for this Project. The Schedule shall be in bar chart form and shall include all aspects of the work, the interrelationship of the various trades and the critical path of the job. The schedule shall include a timeline for the submission, review and approval of shop drawings for critical path items and delivery and installation dates for those same critical path, or long lead time items, (such as electrical transformers and elevator). The Schedule shall coincide with the Contractor’s approved Schedule of Values. The Schedule shall indicate a completion date in advance of the date established for Substantial Completion. The Schedule shall be acceptable to the Architect/Engineer and the Project Coordinator. It shall be revised and reissued at the beginning of every month for the duration of the project. This monthly update progress Schedule shall include a summary comparison of the original schedule and the latest updated schedule (previous month) showing all activity description and dates. These comparison schedules shall be in the form of a summary bar chart, an activity listing report and actual to target comparisons. The reports may include critical activities, float time, duration of each activity, dates of each activity and the network logic (including successors and predecessors of each activity). Included with the written report and electronic copy of the schedule submission noting the above referenced requirements. Failure to provide the Architect/Engineer, or the Project Coordinator with an acceptable, revised Schedule, within seven (7) days of the receipt of a written request, may result in the withholding of the Contractor’s monthly progress payments until such a Schedule is received.

  • Authorized User’s Statement of Work A competitive Mini-Bid is required for every transaction under this Centralized Contract. An Authorized User must prepare a detailed Statement of Work using Appendix F, Attachment 1, Mini-Bid Template. The Authorized User must distribute the Mini-Bid to all qualified Vendors per Lot(s) (unless a Vendor has removed itself from consideration via the Appendix F, Attachment 5, Mini-Bid Participation Interest Template). Contact information, organized by Lot, will be available on the OGS website for this Contract. An Authorized User shall conduct its Mini-Bid in accordance with the requirements set forth in Appendix F, Attachment 2, How to Use this Contract. The following terms and conditions shall apply to each Mini-Bid issued by an Authorized User:  An Authorized User may require the execution of unique forms, such as Confidentiality Non- Disclosure agreements; and  An Authorized User is required to make tentative award and non-award notifications to each Contractor who submitted a response to the Mini-Bid. Additionally, the minimum time, excluding the date of release, between issuance of the Mini-Bid by the Authorized User to the Mini-Bid Opening is as follows:  Xxx 0 Xxxx-Xxxx: Xxxx (0) Xxxxxxxx Xxxx  Xxx 0 Mini-Bids: Ten (10) Business Days

  • Posting of Work Schedules Work schedules shall be written in ink and posted and maintained in such a way as to provide every employee an opportunity to know her shift schedule for an advanced period of six (6) weeks.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.