Sampling Methods of Bulk Milk Sample Clauses

Sampling Methods of Bulk Milk. All samples have a unique barcode to identify the farm. Test results are communicated by SMS, tanker receipts, uploaded to Norco’s intranet and milk production advice. At each collection, a minimum of two raw milk samples are taken. The sample for composition and bulk milk cell count (BMCC) is taken in-line during milk collection by the drip sampler on the tanker. Another sample may be taken by the driver directly from the vat. The sample for the standard plate count (SPC) is taken directly from the vat. In the case where there is only access to the vat by a side door, the sample will be taken once the milk is below the door level. Samples for SPC may be taken in-line during milk collection by the drip sampler on the tanker. A composite sample is taken in part from each vat, where there are multiple vats. For additional testing of vats where segregation of milk is required, sampling and testing for each vat can be arranged. Milk samples may be tested for inhibitory substances, thermodurics and freezing point. Samples for individual cows or additional bulk milk samples can be requested through Norco Milk Supply. Samples will be collected by the tanker driver and results reported to the Supplier by Norco. The costs associated with this additional service will incur a fee charged to the Supplier by a third party.
AutoNDA by SimpleDocs

Related to Sampling Methods of Bulk Milk

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Methods of Measurement The methods used to identify the educational strengths and needs of students are set forth in the approved Application.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Test Samples The Contractor is responsible for providing Samples of sufficient size for test purposes and for coordinating such tests with the Work Progress Schedule to avoid delay.

  • API If the Software offers integration capabilities via an API, your use of the API may be subject to additional costs or Sage specific policies and terms and conditions (which shall prevail in relation to your use of the API). You may not access or use the API in any way that could cause damage to us or the Software, or in contravention of any applicable laws. We reserve the right in our sole discretion, to: (i) update any API from time to time; (ii) place limitations around your use of any API; and (iii) deny you access to any API in the event of misuse by you or to otherwise protect our legitimate interests.

  • EODUF Packing Specifications 7.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • Product Specifications The Company agrees that all Products sold to Xxxx hereunder shall conform to the respective specifications set forth on Schedule A or to such other specifications as are from time to time agreed upon by the Parties.

  • ODUF Packing Specifications 6.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

Time is Money Join Law Insider Premium to draft better contracts faster.