Sewage Plant Chlorination System Scope. In order to ensure compliance to SANS 10298:2009, the scope of work shall include the following: Design a portable Chlorine dosing system suited for the application required at Camden’s Sewage Plant, complete with, but not limited to: • A customised container suitable for the storage of Chlorine gas, partitioned from roof to floor into 2 compartments to enable the separate storage of empty and full cylinders. The container must be designed to store the entire Chlorine dosing system and approximately 3 x 70kg cylinders per side. The container should have a ramp at the entrance to enable delivery or removal of Chlorine cylinders • Auto vacuum change over regulators with a maximum capacity of 2kg/hr with cylinder empty/full status indicator • System to be fitted with a flowrate controller 0 – 2kg/hr • System to be fitted with a free Chlorine analyser and a standard injector. The injector should be automated and controlled based on the free Chlorine analysis of the dosed stream • Gas monitoring system including a sensor and cable • Audible siren and flashing light for gas leak alarm (must be visible from distance of 500m) • Chlorine safety equipment box complete with: Chlorine cylinder spanner, full face gas mask with a spare canister, safety goggles, acid resistant PVC suit and a pair of acid resistant boots • Fitted with UPVC pipework, terminating with union ends just outside booth. NB. The Contractor will be responsible for all pipework required for the new dosing systems and for the tie-in to the existing plant • A foot operated safety shower with an eyewash bowl. NB. The Contractor will be responsible for all necessary pipework required for the potable water supply to the shower • All signage, labels and necessary emergency procedures • A scrubber for the safe removal of Chlorine gas from the storage container in the event of a gas leak • A cylinder trolley for the offloading of Chlorine cylinders • A calibrated platform scale with LED display • Extractor fan, Electrical DB box complete with sufficient lights and 1 x light switch and MCC (Motor Control Centre) for control logic between electronic modules. MCC should be able to operate extractor fan based on door position and leak detection. Contractor to assess current power supply available at respective 380V boards and determine if modifications are required and implement as such with approval from Employer • A control panel for all equipment installed inside the Chlorine storage container • Installatio...
AutoNDA by SimpleDocs

Related to Sewage Plant Chlorination System Scope

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.