Shop Drawings and Working Drawings Sample Clauses

Shop Drawings and Working Drawings. ‌ 43 Developer shall prepare Shop Drawings and Working Drawings necessary to construct the 44 Project. Shop Drawings and Working Drawings must include drawings on 22 inch x 34 inch 1 sized sheets, calculations, and certifications, describe the methods of construction proposed, 2 and adequately define and control the Work. PSQM must review and certify Shop Drawings and 4 prior to implementation, Developer shall submit Design Manager approved Shop Drawings and
AutoNDA by SimpleDocs
Shop Drawings and Working Drawings. ‌ 10 Developer shall prepare Shop Drawings and Working Drawings necessary to construct the 11 Project. Shop Drawings and Working Drawings must include drawings on 22 inch x 34 inch 12 sized sheets, calculations, and certifications, describe the methods of construction proposed, 13 and adequately define and control the Work. PSQM must review and certify Shop Drawings and 15 prior to implementation, Developer shall submit Design Manager approved Shop Drawings and 18 Design issues may arise in ongoing Work reflected in RFC packages. Developer may utilize the 19 RFI process as a communication tool between design and construction. RFIs may be initiated 20 by Developer or ADOT. Developer-initiated RFIs must reflect the following: the general nature, 21 location, and description of the issue; Developer’s proposed mitigation with supporting
Shop Drawings and Working Drawings. ‌ 26 Developer shall prepare Shop Drawings and Working Drawings necessary to construct the 27 Project. Shop Drawings and Working Drawings must include drawings on 22 inch x 34 inch sized 28 sheets, calculations, and certifications, describe the methods of construction proposed, and 29 adequately define and control the Work. PSQM must review and certify Shop Drawings and 31 prior to implementation, Developer shall submit Design Manager approved Shop Drawings and 32 Working Drawings to ADOT. 33 110.10.2.8.2 Request for Information‌ 34 Design issues may arise in ongoing Work reflected in RFC packages. Developer may utilize the 35 RFI process as a communication tool between design and construction. RFIs may be initiated by
Shop Drawings and Working Drawings. ‌ 13 Developer shall prepare Shop Drawings and Working Drawings necessary to construct the 14 Project. Shop Drawings and Working Drawings Submittals must include drawings on 22 inch x

Related to Shop Drawings and Working Drawings

  • Shop Drawings All drawings, prints, diagrams, illustrations, brochures, schedules, and other data that are prepared by Developer, a subcontractor, manufacturer, supplier, or distributor, that illustrate how specific portions of the Work shall be fabricated or installed.

  • Shop Drawings and Samples a. Record date of receipt of Samples and approved Shop Drawings.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin.

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Ownership of Drawings and Specifications All Drawings, Specifications and copies thereof furnished by the A/E are to remain A/E’s property. These documents are not to be used on any other project, and with the exception of one contract set for each party to the Contract, are to be returned to the A/E, upon request, following completion of the Work.

  • As-Built Drawings Within thirty (30) Days of the successful completion of the Acceptance Test, Seller shall provide for Company review a set of the proposed as‑built drawings for the Company-Owned Interconnection Facilities constructed by Seller (and/or its Contractors). Within thirty (30) Days of Company's receipt of the proposed as‑built drawings, Company shall provide Seller with either (i) its comments on the proposed as‑built drawings or (ii) notice of acceptance of the proposed as‑built drawings as final as‑built drawings. If Company provides comments on the proposed as‑built drawings, Seller shall incorporate such comments into a final set of as‑built drawings and provide such final as‑built drawings to Company within twenty (20) Days of Seller's receipt of Company's comments.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!