Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Problem Solving Employees and supervisors are encouraged to attempt to resolve on an informal basis, at the earliest opportunity, a problem that could lead to a grievance. If the matter is not resolved by informal discussion, or a problem-solving meeting does not occur, it may be settled in accordance with the grievance procedure. Unless mutually agreed between the Employer and the Union problem-solving discussions shall not extend the deadlines for filing a grievance. The Union Xxxxxxx or in their absence, the Local Union President, or Area Xxxxxxx, or Chief Xxxxxxx, either with the employee or alone, shall present to the appropriate supervisor a written request for a meeting. If the supervisor agrees to a problem- solving meeting, this meeting shall be held within fourteen (14) calendar days of receipt of the request. The supervisor, employee, Union Xxxxxxx, and up to one (1) other management person shall attempt to resolve the problem through direct and forthright communication. If another member of management is present that person will not be hearing the grievance at Step Two, should it progress to that Step. The employee, the Union Xxxxxxx or in their absence, the Local Union President, or Area Xxxxxxx, or Chief Xxxxxxx, may participate in problem-solving activities on paid time, in accordance with Article 31, Union Rights, Section 1H.
Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.
Core Profession Specific Develop and administer procedures to support effective and efficient National Board and committee operations Profession-specific services, as listed in the National Board’s regulatory plan and annual budget.
Contractor Project Manager The Contractor Project Manager shall serve, from the Effective Date, as the Contractor project manager and primary Contractor representative under this Agreement. The Contractor Project Manager shall (i) have overall responsibility for managing and coordinating the performance of Contractor’s obligations under this Agreement, including the performance of all Subcontractors; and (ii) be authorized to act for and bind Contractor and Subcontractors in connection with all aspects of this Agreement. The Contractor Project Manager shall respond promptly and fully to all inquiries from the JBE Project Manager.
Enterprise Information Management Standards Grantee shall conform to HHS standards for data management as described by the policies of the HHS Office of Data, Analytics, and Performance. These include, but are not limited to, standards for documentation and communication of data models, metadata, and other data definition methods that are required by HHS for ongoing data governance, strategic portfolio analysis, interoperability planning, and valuation of HHS System data assets.
Part-time Scheduling Subject to Section B of this Article, the Employer and the Association endorse the principle that less than full time equivalent ("FTE") positions shall, within reason, be expected to work a biweekly work period that equates to an eighty (80) hour work period multiplied by the position's FTE. (e.g., 80 hours @ .75 = 60 hours). It is further understood by both parties that ASF Members assigned to less than a FTE position may be required, during the peak work periods, to exceed their normal biweekly work period. FLSA non-exempt ASF Members who work a part-time schedule will earn overtime for hours worked in excess of forty (40) in a work week. The Employer agrees to review any ASF position that is less than one (1) FTE if the Association can demonstrate that the position has regularly been required to work a work period that substantially exceeds the normal work period as defined above, and adjust the FTE of the respective position as deemed appropriate by the Employer.
Escrow Format Specification Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.