Slope Mowing Sample Clauses

Slope Mowing. Provide slope mowing on slopes with a greater or steeper than 3 horizontal to 1 vertical slope or other areas that are relatively inaccessible to the use of conventional style equipment.
AutoNDA by SimpleDocs
Slope Mowing. Slope mowing is generally defined as mowing vegetation on inclines steeper than 3 horizontal to 1 vertical and are relatively inaccessible to the use of conventional mowing equipment, e.g., steep slopes and hills near roadside shoulders and wet ditch bottoms, behind guardrails and barriers, along banks on bodies of water, intersections, overpasses, dams, signs, poles, and on steep cut,/fill slopes, etc. These type areas will require the use of specialized equipment designed for slope mowing, e.g., tractor equipped with a hydraulic boom and rotary head cutter.
Slope Mowing. Maintain an individual characteristic rating of 80 or better as evaluated by the scheduled MRP cycles for Slope Mowing. If the Contractor fails to achieve the required MRP score of 80 for any cycle, the Department will deduct one eighth of a percent (0.125%) of the annual contract amount for each MRP point below established performance criteria in this section.

Related to Slope Mowing

  • Mowing Mowing, edging (of sidewalks, paved approaches and curbs), litter removal, herbicide treatment, grass clipping removal, and brush control are included under one bid item. Regular mowing under this contract is generally limited to mowing areas of shoulders, front and back slopes of ditches less than or equal to three-to-one (3:1) slope, roadside retention areas, dry roadside ditch bottoms, median islands and various width utility strips and similar areas. Slope mowing, which is also a contract requirement, is generally limited to slopes greater or steeper than three-to-one (3:1) and are relatively inaccessible to the use of conventional mowing equipment (e.g., steep slopes, retention area banks and shores, bridge/overpass banks, canal banks, wet roadside ditches, etc). These types of areas will normally require equipment specifically designed for this type of work. When slope mowing is performed, it will incorporate the use of string trimmers to protect the integrity of the slope and prevent damage to the turf. Sign posts, mailboxes, guardrails, trees, roadside outfall structures, fences, divider walls, shrubs, plants, light poles, utility flags or other such obstacles to mowing will be hand mowed or trimmed around as necessary to present a groomed appearance. Top of vegetation on wet bottom ditches areas must be cut-off to the water’s level. Particular attention will be paid to planted areas. Any damage that occurs to plants, trees, shrubs, mulched beds, tree rings, sprinkler heads, etc., will be repaired or restored, at the Contractor’s expense, before the cycle is completed. Mowing will also include grass clipping removal and litter removal, edging, and herbicide treatment. These costs will be included in the unit price bid for right-of-way mowing.

  • Towing Contractor shall meet all requirements set forth in Title 46 CFR, Part 15 for Towing Assistance. Unless otherwise specified in the work request, Purchasers require a dead-ship tow plan to be approved by the Coast Guard in accordance with the Puget Sound Harbor Safety Committee for vessels over 50-feet, unless the Coast Guard deems the plan unnecessary. Contractor is responsible to obtain a tow plan and provide Purchaser with an approved copy at least one (1) business day prior to the tow. The plan is located on the Puget Sound Harbor Safety Committee’s website under the Safety Plan link on the left side of the page (xxxx://xxxxx.xxx/about). This site will have the most update version of the plan.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Fencing The SPD shall Fence the demarcated boundary of the Demised Premises at the SPD’s own expense in every respect.

Time is Money Join Law Insider Premium to draft better contracts faster.