Sloping Sample Clauses

Sloping. Leave all earth slopes with uniform roughened surfaces, except as described in (b) below, with no noticeable break as viewed from the road. Except in solid rock, round tops and bottoms of all slopes including the slopes of drainage ditches. Round material overlaying solid rock to the extent practical. Scale all rock slopes. Slope rounding is not required on tolerance class D though M roads. If a slide or slipout occurs on a cut or embankment slope, remove or replace the material, and repair or restore all damage to the work. Bench or key the slope to stabilize the slide. Reshape the cut or embankment slope to an acceptable condition.
AutoNDA by SimpleDocs

Related to Sloping

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Developing Educator Plan shall mean a plan developed by the Educator and the Evaluator for one school year or less for an Educator without Professional Teacher Status (PTS); or, at the discretion of an Evaluator, for an Educator with PTS in a new assignment.

  • Pruning Nondestructive thinning of lateral branches to enhance views or trimming, shaping, thinning or pruning of a tree necessary to its health and growth is allowed, consistent with the following standards:

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

  • Hazing Hazing is a process, based on tradition that is used by groups to maintain a hierarchy (i.e., a pecking order) within the group. Regardless of consent, the rituals require individuals to engage in activities that are physically and/or psychologically stressful. These activities can be humiliating, demeaning, intimidating, and exhausting, all of which results in physical or emotional discomfort. Hazing is about group dynamics and proving one’s worthiness to become a member of a specific group. The newcomer, or victim, is hazed. Once accepted by the group, the victim may become a bystander, watch others get hazed, achieve senior status, and ultimately become a perpetrator of hazing. In New Jersey, hazing is a separate criminal offense under N.J.S.A. 2C:40-3. School officials should be aware that hazing which involves the participation of a coach or a teacher may also constitute child abuse. Hazing may also involve other predicate crimes, such as sexual assault. Hazing may also constitute HIB. As noted in Article 4.4.2, although HIB is not a separately defined criminal offense, the conduct that constitutes bullying may constitute one or more criminal or disorderly person offenses, including assault, harassment, threats, robbery and sexual offenses.

  • Caching The Participating Institutions and the Authorized Users are authorized in the course of an automatic process of an internet browser or any other software to make temporary local digital copies of the Licensed Materials in order to ensure proper operation and use of such internet browser or for proper functioning of such software. For the avoidance of doubt, the cached copy is not a derivative work.

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Fueling delivering or dispensing fuel, defueling and refueling, or any other transfer of fuel on Airport property.

Time is Money Join Law Insider Premium to draft better contracts faster.