Station Requirements Sample Clauses

Station Requirements. 5.16.75 Drugs, Dangerous Drugs and Controlled Substances 5.16.80 Inspections 5.16.85 Enforcement 5.16.90 Unprofessional Conduct 5.16.95 Administrative Hearing Process 5.16.10 Complaints 5.16.105 Compliance 5.16.110 Exemptions from Requirements for Ambulance Provider Agreement 5.16.115 Miscellaneous Requirements 5.16.120 Special Events 5.16.125 Ambulance Rates 5.16.130 Interfacility Transfers
AutoNDA by SimpleDocs
Station Requirements. A. Every station and substation used in a commercial or public entity service must meet the following requirements:
Station Requirements. For the Type 1 wet well/dry well lift station, the below grade dry well shall be completely factory built, unless otherwise approved by the District. The drywell shall have an above ground entrance with lockable hatch (typically 1.5 feet above grade) made of steel or fiberglass, as approved by the District. The wet well for Type 1 and Type 2 shall have an at grade, lockable, flat lid with H20 or H30 (pending location in station and or as directed) rated 36”x72” LW products HD Access hatch or approved equal . Both Type 1 and 2 lift station construction shall be in compliance with the Occupational Safety & Health Act (OSHA), Underwriters Laboratory (UL), American Society for Testing and Materials (ASTM), National Electrical Code (NEC) and other applicable codes and regulations. Sewage lift stations shall be provided with the following options in addition to those described in the instrumentation and pump control sections of this document:  Running time meters  Intrinsically safe displacement switch relays  Pump failure alarm relays  Phase fail relays  Pump running lights  Ultrasonic level sensors (bubblers or other level sensors are not acceptable)  Level indicators  Operator in trouble button  Check valve position sensor  Amp meters  Hand-Off-Auto (H/O/A) switch  Motor disconnect located in the drywell or within sight of the motor The following spare parts shall be provided to the District: Type 1 & 2 lift stations:  Mechanical seal  2 Impellers (1-right and 1-left)  Impeller wear rings, if applicable  Impeller shaft  Bearings  Set of gaskets and O-ring seals  Set of keys, dowels, pins. Etc.  Set of shaft sleeves  Check valve re-build kit  Any special tools required to dismantle pump  Spare motor Type 2 lift station shall also include: one spare pump

Related to Station Requirements

  • GRADUATION REQUIREMENTS I understand that in order to graduate from the program and to receive a certificate of completion, diploma or degree I must successfully complete the required number of scheduled clock hours as specified in the catalog and on the Enrollment Agreement, pass all written and practical examinations with a minimum score of 80%, and complete all required clinical hours and satisfy all financial obligations to the College.

  • Notification Requirements 1. If the Family Leave is foreseeable, the employee must provide the agency/department with thirty (30) calendar days notice of his or her intent to take Family Leave. 2. If the event necessitating the Family Leave becomes known to the employee less than thirty (30) calendar days prior to the employee's need for Family Leave, the employee must provide as much notice as possible. In no case shall the employee provide notice later than five (5) calendar days after he or she learns of the need for Family Leave. 3. For foreseeable leave due to a qualifying exigency, an employee must provide notice of the need for leave as soon as practicable, regardless of how far in advance such leave is foreseeable. 4. When the Family Leave is for the purpose of the scheduled medical treatment or planned medical care of a child, parent, spouse or registered domestic partner, the employee shall, to the extent practicable, schedule treatment and/or care in a way that minimizes disruption to agency/department operations.

  • Installation requirements We (if we install the System) or our contractor (if we procure a contractor to install the System) must:

  • Application Requirements This application shall contain, as a minimum, a sketch showing the location of proposed facilities; a description, sketch, manufacturer’s brochure, etc. of the proposed facilities; and a description of the operation proposed. (11-28-90) 101. -- 199. (RESERVED)‌ 200. OPERATIONAL AGREEMENT.‌‌

  • Construction Requirements (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.

  • Information Requirements The Company covenants that, if at any time before the end of the Effectiveness Period the Company is not subject to the reporting requirements of the Exchange Act, it will cooperate with any Holder and take such further reasonable action as any Holder may reasonably request in writing (including, without limitation, making such reasonable representations as any such Holder may reasonably request), all to the extent required from time to time to enable such Holder to sell Registrable Securities without registration under the Securities Act within the limitation of the exemptions provided by Rule 144 and Rule 144A under the Securities Act and customarily taken in connection with sales pursuant to such exemptions. Upon the written request of any Holder, the Company shall deliver to such Holder a written statement as to whether it has complied with such filing requirements, unless such a statement has been included in the Company’s most recent report filed pursuant to Section 13 or Section 15(d) of Exchange Act. Notwithstanding the foregoing, nothing in this Section 7 shall be deemed to require the Company to register any of its securities (other than the Common Stock) under any section of the Exchange Act.

  • Certification Requirements The hospice program certifies and attaches hereto documentation that: (a) it is Medicare approved and meets all Medicare conditions of participation (42 CFR 418); and (b) is licensed pursuant to any applicable state or local law.

  • Encryption Requirements DST will not locally store Fund Data on any laptops or mobile devices (e.g., Blackberries, PDAs) managed by DST.

  • Publication Requirements Those seeking to include renderings of more than 10 images from the UND Biometrics Database in reports, papers, and other documents to be published or released must first obtain approval in writing from the UND Principal Investigator. In no case should the face images be used in a way that could cause the original subject embarrassment or mental anguish.

  • Notification Requirement Through and up to the conclusion of the Non-Competition Period, Executive shall give notice to the Company of each new business activity he plans to undertake, at least seven (7) days prior to beginning any such activity. Such notice shall state the name and address of the Person for whom such activity is undertaken and the nature of Executive’s business relationship(s) and position(s) with such Person.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!