Type 2. Xxxxxxx will obtain from the NXX code administrator a full NXX consistent with established industry guidelines for use with Type 2A and/or Type 2B interfaces. For calls in the Land-to-Mobile direction, Carrier will utilize the NXX. The administration of the NXX, once assigned, including updates to the LERG, will be the responsibility of Carrier.
Type 2. An assembly in which the wheel has a different offset from that of the wheel fitted in the same axle position for normal operation of the vehicle;
Type 2. An intersection where a grade separation structure has been constructed to carry the local road over the toll highway.
Type 2. Carrier will obtain from the NXX Code administrator a full NXX consistent with established industry guidelines for use with Type 2A and/or Type 2B interfaces. For calls in the Telco to Carrier direction, Carrier must utilize the NXX. The administration of the NXX, once assigned, including updates to the LERG, will be the responsibility of Carrier.
Type 2. Employees who have six (6), seven (7), or eight (8) hours on their contract, and whose day runs an equal amount of time, are expected to have a “working lunch”, which is expected to occur in district. These are paid breaks. This type will include central office support staff, Junior High and High School secretaries, cafeteria workers, paraprofessionals, and some custodians and maintenance workers.
Type 2. It is evident that the corner period TC may depend on many factors, most of which influence the overall shape of the response spectrum. In particular the relative contribution of longer period motion to the spectrum will clearly influence the shape of the ERS within the constant velocity portion of the spectrum. In the Xxxxxxx-Xxxx formulation the intermediate and long- period motion, TC is constrained by the peak ground velocity. The relative contribution of long-period to short-period motion may be quantified by the ratio of PGV to PGA. Dimensional analysis indicates that this ratio can be interpreted as the period of an equivalent harmonic wave, thus indicating the significant periods of motion (Xxxxxx, 1996). It has also been shown that the ratio of PGV to PGA scales clearly with magnitude (Figure 4.15), and displays relative stability over distance (Xxxxxx et al., 2010). Xxxxxx et al. (2000) propose a linear scaling of TC with PGV/PGA: T PGV (4.13) C 5 PGA
Type 2. PKL purchased inherited full risk equipment. This equipment is identical to Type 1 in all ways, other than PKL will pay the Client the sum specified in the signature sheet to take ownership of the equipment after the contract start date. PKL will be responsible for all maintenance as above, but will not take ownership of this equipment until payment is made.
Type 2. Wet well submersible pumps and motors station