Subsurface Utility Excavation – ASCE Quality Level. “A” L & S will perform a total of ten (10) (5 soft surface, 5 hard surface) excavation test holes at positions determined by the client. A Sunshine 811 ticket request will be called to allow 72 hours in advance of the proposed excavation as is required by law. The utility at each position will be verified both horizontally and vertically up to a depth of approximately ten (10) feet. L & S is capable of soft excavating to a depth of six (6) feet and air probing to a depth of ten (10) feet. It is possible that ground water intrusion and/or soil conditions at any given position could prevent a clear identification of any utility or obstruction. The depth and size of each utility will be measured and noted on a Subsurface Utility Report for each position, and if visible, the composition of the material of the pipe will also be noted. However, the condition of the material will not be determined by L & S as this is not within our expertise. Each position will be restored to near pre- excavated condition with the excavated soil or like materials such as an asphalt or concrete patch.
AutoNDA by SimpleDocs

Related to Subsurface Utility Excavation – ASCE Quality Level

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes.

  • Workplace adjustment An employer wishing to employ a person under the provisions of this clause shall take reasonable steps to make changes in the workplace to enhance the employee’s capacity to do the job. Changes may involve re-design of job duties, working time arrangements and work organisation in consultation with other employees in the area.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Subprojects 1. The Borrower shall make Grants to Beneficiaries (Small Farmers, Municipalities and Organizations) for Subprojects (Farmers’ Business Initiatives, Infrastructure Subprojects and Environmental Subprojects) in accordance with eligibility criteria and procedures acceptable to the Bank as further detailed in the Project Operational Manual.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.