Survey Control Index Sheets Sample Clauses

Survey Control Index Sheets. The Engineer’s Surveyor shall prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet, signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet should be used in conjunction with each other. The following information should be shown on the Survey Control Index Sheet:  Overall view of the project and primary control monuments set for control of the project.  Identification of the control points.  Baseline or centerline.  Graphic (Bar) Scale.  North Arrow.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which is signed, sealed, and dated by a Texas Professional Engineer.  RPLS signature, seal and date.  TxDOT title block containing District Name, County, Highway, and CSJ. The following information should be shown on the Horizontal and Vertical Control Sheet:  Location for each control point, showing baseline and centerline alignment and North arrow.  Station and offset (with respect to the baseline or centerline alignments) of each identified control point.  Basis of Datum for horizontal control (base control monument, benchmark name, number, datum).  Basis of Datum for the vertical control (base control monument, benchmark name, number, datum).  Date of current adjustment of the datum.  Monumentation set for Control (Description, District name/number and Location ties).  Surface Adjustment Factor and unit of measurement.  Coordinates (SPC Zone and surface or grid).  Relevant metadata.  Graphic (Bar) Scale.  Placement of note “The survey control information has been accepted and incorporated into this PS&E” which is signed, sealed and dated by a Texas Professional Engineer.  RPLS signature, seal and date.  TxDOT title block containing District Name, County, Highway No., and CSJ. WAs Used DocuSign Envelope ID: 56C9F445-711D-4155-8CAC-4A873A2298E4
AutoNDA by SimpleDocs

Related to Survey Control Index Sheets

  • Statistical Sampling Documentation a. A copy of the printout of the random numbers generated by the “Random Numbers” function of the statistical sampling software used by the IRO.

  • Exception Where Databases Contain Sufficient Information A Reporting Financial Institution is not required to perform the paper record search described in subparagraph D.2. of this section if the Reporting Financial Institution’s electronically searchable information includes the following:

  • REVIEW OF THE FRAMEWORK PRICES LOTS 1 – 10

  • Monthly Updates The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations. (See also Articles 2.1.2 and 2.1.5).

  • Root-­‐zone Information Publication ICANN’s publication of root-­‐zone contact information for the TLD will include Registry Operator and its administrative and technical contacts. Any request to modify the contact information for the Registry Operator must be made in the format specified from time to time by ICANN at xxxx://xxx.xxxx.xxx/domains/root/.

  • Reference Materials The Board agrees to continue to make available to employees the reference materials maintained by the district. Principals are encouraged to provide additional reference materials of high use in schools where feasible.

  • Rental Rates and Wage Rates for Change Orders As soon as is practical, but prior to the completion of the Construction Preparation Period and in any event prior to the commencement of any Work on the Site, the Contractor shall submit in accordance with the style and format of a specimen to be furnished by the Owner for consideration of the Owner the following: (1) a proposal for rental rates on heavy construction equipment that shall apply in the event Change Order Work is performed, and (2) a proposal for wage rates for the types of project labor that shall apply in the event of the execution of any Change Order Work. Under penalty of false swearing, a principal of the contracting firm shall certify that the proposal for rental rates and proposal for wage rates do not exceed current costs for like services. The Owner will in no event consider a rental rate in excess of eighty percent of the rate set forth in the latest edition of the "Compilation of Nationally Averaged Rental Rates for Construction Equipment" of the Associated Equipment Distributors unless the rates proposed in excess of eighty percent are supported by proof satisfactory to the Owner that the excess rates are reasonable. If the equipment is owned by the Contractor the costs shall be charged at a maximum of eighty percent of market monthly rental rates for the amount of time used. If applicable, transportation costs may be included. The decision of the Owner shall be final, binding and conclusive on all parties. Rental rates shall be payable only for the actual time the equipment is required on the Site.

  • zone Information Publication ICANN’s publication of root-zone contact information for the TLD will include Registry Operator and its administrative and technical contacts. Any request to modify the contact information for the Registry Operator must be made in the format specified from time to time by ICANN at xxxx://xxx.xxxx.xxx/domains/root/.

  • MATERIAL SAFETY DATA SHEETS Contractor is required to ensure Material Safety Data Sheets (“MSDS”) are available, employees are trained in the use of MSDS, and MSDS are in a readily accessible place at the Site. This requirement applies to all materials with an associated MSDS per the federal “Hazard Communication” standard or employees’ Right-to-Know laws. Contractor is also required to ensure proper labeling and training on any substance brought onto the Site and that any person working with the material (or who is subject to possible exposure by use of the material or contact with the material), is informed of the possible and/or real hazards of the substance, and follows proper handling and protection procedures.

  • Reference Description Dates E/CAM/0305 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0306 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0307 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0308 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0309 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0310 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0311 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 Reference Description Dates E/CAM/0312 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0313 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0314 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0315 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0316 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0317 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0318 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0319 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0320 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0321 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0322 Deeds Grounds in Xxxxxxxx Xxxxxx xxx Xxxxxxx Xxxxxx; 1-21 (incl) St Paul's Terace, King's Road; six messuages in Canal Terrace, fronting Regent's Canal 1824-1832

Time is Money Join Law Insider Premium to draft better contracts faster.