Surveys and Measurements Sample Clauses

Surveys and Measurements. The Contractor, prior to all submissions to HRA, shall verify all quantities and conditions. Should the Contractor discover any discrepancy between actual conditions and those indicated elsewhere that would prevent following good practice or the intent of the Specifications; he shall notify the Contract Manager in writing. The Contractor shall not proceed with the work until written instructions from the Contract Manger are received. No extra compensation will be allowed because of differences between actual dimensions and measurements indicated on the Drawings.
AutoNDA by SimpleDocs

Related to Surveys and Measurements

  • ACCURACY OF CUSTOMER’S PLANS AND MEASUREMENTS a) The Company is entitled to rely on the accuracy of any plans, specifications and other information provided by the Customer. The Customer acknowledges and agrees that in the event that any of this information provided by the Customer is inaccurate the Company accepts no responsibility for any loss, damages or costs howsoever resulting from these inaccurate plans, specifications or other information.

  • Measurements All production shall be accurately measured using standards established by the American Gas Association (AGA) and/or the American Petroleum Institute (API) and all measuring devices shall be tamper proof as nearly as possible. Oil royalties due within the terms of this lease shall be calculated on actual and accurate measurements within API standards unless a different means of measurement, subject to Lessor's approval, is provided.

  • Measurements and Dimensions Before ordering material or doing work that is dependent upon coordination with building conditions, the Contractor shall verify all dimensions, elevations, grades, and pitch by taking measurements at the building and shall be responsible for the correctness of same. Any discrepancies between the drawings and/or specifications and the existing conditions shall be referred to the Design Professional for additional instructions before any work affected thereby is begun.

  • Interim Measures 6.1 The Parties acknowledge that the British Columbia Claims Task Force made the following recommendation concerning interim measures:

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Safety Measures Awarded vendor shall take all reasonable precautions for the safety of employees on the worksite, and shall erect and properly maintain all necessary safeguards for protection of workers and the public. Awarded vendor shall post warning signs against all hazards created by the operation and work in progress. Proper precautions shall be taken pursuant to state law and standard practices to protect workers, general public and existing structures from injury or damage.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Methods of Measurement The methods used to identify the educational strengths and needs of students are set forth in the approved Application.

  • Classifications 6.1 Each Employee is classified as assessed by the Employer as follows:

  • Eye Examinations For all covered EMPLOYEES required to use VDTs on average at least two (2) hours per day, the Department will provide a base line eye examination at the Occupational Safety and Health facility ("OSH"), followed by an eye examination at OSH once a year.

Time is Money Join Law Insider Premium to draft better contracts faster.