System Highlights Sample Clauses

Related to System Highlights

  • Highlights WI-HER and RTI collaborated with NTDCP to conduct a GESI Pause and Reflect (P&R) meeting in Arusha from October 17-19, 2022. The meeting brought together the six councils (Ulanga DC, Mlimba DC, Longido DC, Monduli DC, Simanjiro DC and Kiteto DC) where the GESI behavior change activity was implemented in FY22 to document lessons learned and plan for GESI implementation in FY23. The meeting highlighted the importance of health education in addressing barriers to MDA uptake and involving government and traditional community leaders in MDA. Participants also discussed how to integrate GESI lessons learned into the CDD training package and potential activities for CCHPs. • Act | East supported the NTDCP to conduct a preparation meeting for the upcoming CCHP Pause and Reflect meeting in November. The preparation meeting was conducted in Singida from October 21-23, 2022. The technical team involved officers from PORALG, Directorate of Policy and Planning (DPP) office of the MOH, R4D, and WI-HER who collaboratively reviewed the meeting agenda, presentations, and documentation tools. During this preparation meeting, NTDCP and XXXXXX strongly recommended a high-level advocacy following the CCHP P&R meeting. This will be important for more resource mobilization at national and sub-national levels. Upcoming activities requiring COVID protocols: • Act | East will collaborate with NTDCP, DPP office of the MOH, and PORALG to conduct the CCHP P&R meeting from November 15-18 in Dodoma. The meeting will bring together district NTD coordinators and health secretaries from the 15 districts that implemented the CCHP activity in FY22 to gather feedback on the CCHP process, successes, challenges and way forward. • In collaboration with NTDCP and PORALG, Act | East will organize review and planning meetings for the districts and regions conducting trachoma and OV MDAs in FY23. The activity will be conducted in Morogoro from November 7-10, 2022 and will be followed by the training of trainers for trachoma and OV MDAs on November 11th. • Act | East will support the NTDCP to conduct SCH and STH MDA in 41 districts in November 2022. This MDA was postponed from FY22 Q4. • In collaboration with NTDCP, Act | East will conduct an LF disease-specific assessment (DSA) outcome investigation in Pangani DC and Kilwa DC in November. • Act | East Tanzania XXXXX staff will attend the NTD Information System (NIS) training in Mozambique from November 28 – December 3rd. • Act | East will support NTDCP and the National Institute for Medical Research (NIMR) Tanga lab to conduct analysis of Dried Blood Spot (DBS) samples collected in FY22 for OV using OV16 rapid diagnostic tests. COVID-19 data monitoring sources: WHO: xxxxx://xxxxx00.xxx.xxx/region/afro/country/tz October 2022 UGANDA Act | East Partner: RTI, The Xxxxxx Center, WI-HER, R4D, Save the Children Total population: 46,205,893 (2022) COP: [Redacted] Districts: 136 RTI HQ Team: [Redacted] Endemic diseases: LF (66), TRA (41), OV (43), SCH (91), STH (136) TABLE: Activities supported by USAID in FY23 LF OV Trachoma MDA N/A 8/11 districts (R1) 0/11 districts (R2) 0/2 districts (Dec 2022) 0/5 districts (June 2023) DSAs (#EUs) TAS 2: 0/8 EUs TAS 3: 0/3 EUs N/A TSS+: 2 EUs Confirmatory mapping: 2 districts XXXXX Targeted follow-up investigation in two districts of Nabilatuk and Buliisa Data quality assessment (DQA) in Buliisa district HSS High-level meeting on mainstreaming NTD drugs Building domestic resource mobilization capacity workshops National advocacy meeting Finalize and institutionalize GESI MDA training curriculum Finalize integration of GESI into MOH-led social and behavior change packages GESI behavior change activity scale up in two districts. Summary and explanation of changes made to table above since last month: N/A • Table is updated with planned FY23 activities. • OV MDA was completed in 8 districts by TCC. Ebola Update: • On 15 September, an index case of Ebola virus disease (EVD) was identified in Mubende District, Uganda. The Ministry of Health declared an outbreak of Sudan EVD on 20 September. As of 6 November, 135 cases have been confirmed throughout 7 districts. The CoP has weekly update meetings with HQ and HO and is actively monitoring the situation. We are developing SOPs and monitoring closely how the virus evolves within Uganda to be ready to change plans should Ebola be confirmed in our implementing districts. Highlights: RTI • Cross border Joint MDA Review Meeting. Act | East supported the RTI team to attend the Joint MDA review meeting in Kisumu, Kenya from 26–27 October. The objective of the meeting was to review progress and document learnings and gains from the previous joint MDA and to disseminate the MDA results. The meeting was attended by Senior MOH officials from both countries, district officials from border districts, Secretary for Health West Pokot County and partners. Some of the key recommendations were (1) to delay trachoma impact survey in West Pokot for 1 more round of MDA to have a joint impact survey with Uganda to realize intended outcomes; (2) Kenya adopting house to house approach of MDA implementation with VHTs; and

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • System Description The DLCS is a network consisting of devices which are remotely controlled over RF transmission equipment by the PowerCAMPTM Software or equivalent. CL&P shall have access to the PowerCAMP™ LMS (as defined below) via the web interface. The PowerCAMPTM LMS shall include the software and hardware necessary to manage the Control Devices installed at the End-use Equipment at Participating Facilities. The PowerCAMPTM LMS includes AER’s PowerCAMPTM Server and PowerCAMPTM Suite, networking equipment, and third party software. PowerCAMPTM LMS Hardware

  • Contract Database Metadata Elements Title: Whitesville Central School District and Whitesville Central School Educational Support Staff Association (2003) Employer Name: Whitesville Central School District Union: Whitesville Central School Educational Support Staff Association Local: Effective Date: 07/01/2003 Expiration Date: 06/30/2006 PERB ID Number: 10699 Unit Size: Number of Pages: 23 For additional research information and assistance, please visit the Research page of the Catherwood website - xxxx://xxx.xxx.xxxxxxx.xxx/library/research/ For additional information on the ILR School - xxxx://xxx.xxx.xxxxxxx.xxx/ AGREEMENT BETWEEN WHITESVILLE CENTRAL SCHOOL EDUCATIONAL SUPPORT STAFF ASSOCIATION AND THE WHITESVILLE CENTRAL SCHOOL DISTRICT JULY 1, 2003 THROUGH JUNE 30, 2006 TABLE OF CONTENTS ARTICLE TITLE PAGE Preamble 1 I Recognition 1 II Collective Bargaining U n i t 1 III Dues/Agency Fee Ckoffand Payroll Deduction 1 IV Rights of Employees 2 V Rights of Employer ------------- 2 VI Personnel F i l e 2 VII Employee Definitions 3 VIII Permanent Status/Seniority 4 IX Wages 5 X Overtime 7 XI Vacation 7 XII Holidays 8 XIII Sick Leave and Leavesof A b s e n c e 8 XIV Conference, Workshops,Required Courses 10 XV Meal Allowance and M i l e a g e 11 XVI Retirement 11 XVII Insurance 12 XVIII Cafeteria P l a n 14 .XIX Uniform Allowance------------------ 14 XX Hours of W o r k 14 XXI Transfers/Promotions 15 XXII Job Descriptions 15 XXIII Grievance Procedure 15 XIV Copies of the Contract 18 XV Zipper C x x x x x 18 XXVI Legislative Clause 18 XXVII Duration 19 SIGNATURES 19 APPENDIX A Grievance F o r m 20 APPENDIX B Dues Authorization F o r m 21

  • Functionality Customer is entitled to additional functionality previously purchased or bundled with the software if available in the version or update released on or after the start date of the Agreement. Customer acknowledges that certain functionality in current and previous software versions may not be available in future upgrades. Added functionality may require additional paid services (clinical and technical) to configure and support.

  • Service Content SORACOM Air Global Service contains the following services. Subscription (plan) Content plan01s It is suitable for IoT/M2M equipment. plan01s - Low Data Volume It is suitable for IoT/M2M equipment. Especially, it is suitable for small data usage. plan01 plan01 can be purchased in the USA and Japan. It is characterized by a wide coverage area. plan01 - Low Data Volume plan01 - Low Data Volume can be purchased in the USA and Japan. It is suitable for small data usage. plan02 plan02 can be purchased in Europe. Data communication charges are kept low in Europe and it is suitable for use in Europe. Subscription (Speed Class) Content s1 class Data Transmission Service that adjusts the outgoing and incoming transmission speed between the terminal and SORACOM so that the transmission is symmetrical

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Standards for Network Elements 1.8.1 BellSouth shall comply with the requirements set forth in the technical references, as well as any performance or other requirements identified in this Agreement, to the extent that they are consistent with the greater of BellSouth’s actual performance or applicable industry standards.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

Time is Money Join Law Insider Premium to draft better contracts faster.