Common use of System Protection Requirements Clause in Contracts

System Protection Requirements. a) Line 167 Connecting Transmission Owner’s Arcade - Five Mile Line 167 shall be protected using a permissive overreaching transfer trip (“POTT”) for the A package and step distance as the B package. Direct transfer trip (“DTT”) will be used between the Xxxxxx Road Collector Substation and the line terminals at Connecting Transmission Owners’ Arcade and Five Mile Substations to ensure removal of the generation. This will require the installation of two (2) RFL GARD 8000 tele-protection sets at the Xxxxxx Road Collector Substation. Redundant 34.5kV line protection to remove the generation for line faults shall be provided and two (2) sets of 2000:5, C800 multi-ratio current transformers (“CTs”) shall be provided for these schemes.

Appears in 4 contracts

Samples: Service Agreement, Service Agreement, Service Agreement

AutoNDA by SimpleDocs

System Protection Requirements. a) Line 167 Connecting Transmission Owner’s Arcade - Five Mile Line 167 shall be protected using a permissive overreaching transfer trip (“POTT”) for the A package and step distance as the B package. Direct transfer trip (“DTT”) will be used between the Xxxxxx Road Collector Substation and the line terminals at Connecting Transmission Owners’ Arcade and Five Mile Substations to ensure removal of the generation. This will require the installation of two (2) RFL GARD 8000 tele-protection sets at the Xxxxxx Road Collector Substation. Redundant 34.5kV line protection to remove the generation for line faults shall be provided and two (2) sets of 2000:5, C800 multi-ratio current transformers (“CTs”) shall be provided for these schemes.

Appears in 2 contracts

Samples: Service Agreement, Service Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.