Tabulation of Quantities Sample Clauses

Tabulation of Quantities. Prepare the tabulation of quantities sheet in standard FDOT format and show any quantities tabulated for location, size, and quantity. Standard notes referring to item numbers must also be shown on this sheet or on plan sheets. When there is not a roadway component, see FDM 307.1 for placing Summary of Quantities sheets in the UWHC plan set. Summary of pay item sheets will be prepared as noted in FDM 304. Modification for Non-Conventional Projects: Delete FDM 330.4. 330.5 Plan Sheets Utility plans must show full construction details for all utilities to be relocated or constructed by the contractor as covered by the UWHC Agreement. A plan-profile sheet format should be utilized where appropriate. Show all underground utilities in the plan portion, and those which equal or exceed 4'' must also be shown in the profile portion. Show all above ground Utilities in the plan portion (inclusive of underground connections). When the construction limits are restricted such as when a power line is above and near a sanitary or water facility, either the facility (overhead lines) must be identified and shown in profile, or the minimum available vertical clearances, along with the type facility, stated on the plans. Show applicable project information similar to that described in FDM 312. Show utilities to be relocated or constructed in plan and profile and in accordance with the FDOT CADD Software. The scale used should be the same as that used for the roadway plan- profile sheets. The disposition and final ownership of any utility infrastructure that is to be removed by the contractor and salvaged must be identified in the plans. Include the address of the Utility/Agency Owner receiving the salvaged utility infrastructure in the pay item notes on the Summary of Quantity Sheet (see FDM 307 and Exhibit 307-1). Modification for Non-Conventional Projects:
AutoNDA by SimpleDocs
Tabulation of Quantities. ‌‌ The tabulation of quantities sheet shall be prepared in standard FDOT format and should show any quantities tabulated for location, size, quantity, etc. Standard notes referring to item numbers shall also be shown on this sheet or on plan sheets. Summary of pay item sheets will be prepared as noted in Chapter 4 of this volume.
Tabulation of Quantities. PAY ITEM NO. DESCRIPTION UNIT SHEET NUMBERS TOTAL THIS SHEET GRAND TOTAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL 101-1 MOBILIZATION LS 1 1 102-1 MAINTENANCE OF TRAFFIC DA 1 1 102-14 TRAFFIC CONTROL OFFICER HR 124 124 124 104-10-3 SEDIMENT BARRIER LF 442 442 442 107-2 MOWING AC 0.13 0.13 0.13 110-1-1 CLEARING & GRUBBING AC 1.56 1.56 1.56 110-4-10 REMOVAL OF EXISTING CONCRETE PAVEMENT SY 119 119 119 120-1 REGULAR EXCAVATION CY 2.0 2.0 2.0 120-6 EMBANKMENT CY 39.0 39.0 39.0 160-4 TYPE B STABILIZATION SY 10 10 10 285-709 OPTIONAL BASE, BASE GROUP 09 SY 10 10 10 327-70-8 MILLING EXISTING ASPHALT PAVEMENT, 2 1/2" AVG DEPTH SY 4611 4611 4611 334-1-13 SUPERPAVE ASPHALTIC CONC, TRAFFIC C TN 382.0 382.0 382.0 337-7-25 ASPHALT CONCRETE FRICTION COURSE, INC BIT, FC-5, PG 76-22 TN 192.0 192.0 192.0 425-5 MANHOLE, ADJUST EA 3 3 3 520-1-10 CONCRETE CURB & GUTTER, TYPE F LF 246 246 246 520-2-1 CONCRETE CURB, TYPE A LF 124 124 124 520-5-12 TRAFFIC SEPARATOR CONCRETE-TYPE I, 6' WIDE LF 3 3 3 522-2 CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK SY 277 277 277 527-2 DETECTABLE WARNINGS SF 97 97 97 570-1-1 PERFORMANCE TURF SY 68 68 68 580-1-1 LANDSCAPE COMPLETE- SMALL PLANTS LS 1 1 1 630-2-11 CONDUIT, FURNISH & INSTALL, OPEN TRENCH LF 276 276 276 630-2-12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE LF 514 464 464 632-7-1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 1 1 1 632-7-6 SIGNAL CABLE, REMOVE- INTERSECTION PI 1 1 1 000-0-000 FIBER OPTIC CABLE, RELOCATE, UNDERGROUND LF 98 98 98 633-2-31 FIBER OPTIC CONNECTION, INSTALL, SPLICE EA 12 12 12 633-3-13 FIBER OPTIC CONNECTION HARDWARE, F&I, PRETERMINATED CONNECTOR ASSEMBLY EA 1 1 1 633-3-45 FIBER OPTIC CONNECTION HARDWARE, RELOCATE PATCH PANEL, PRETERMINATED EA 1 1 1 633-8-1 MULTI-CONDUCTOR COMMUNICATION CABLE, FURNISH & INSTALL LF 519 519 519 000-0-000 SPAN WIRE ASSEMBLY, F&I, TWO POINT, BOX OR DROP BOX PI 1 1 1 635-2-11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE EA 13 13 13 639-2-1 ELECTRICAL SERVICE WIRE, RELOCATE LF 86 86 86 646-1-11 ALUMINUM SIGNALS POLE, PEDESTAL EA 4 4 4 646-1-12 ALUMINUM SIGNALS POLE, FURNISH & INSTALL PEDESTRIAN DETECTOR POST EA 4 4 4 649-1-17 STEEL STRAIN POLE, F&I, TYPE PS- X EA 4 4 4 649-1-63 STEEL STRAIN POLE, REMOVE, SHALLOW FOUNDATION REMOVAL, BOLT ON ATTACHMENT EA 2 2 2 650-1-14 VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL ALUMINUM, 3 SECTION, 1 WAY AS 20 20 20 650-1-19 VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL ALUMINUM, 5 SECTION CLUSTER, 1 WAY ...

Related to Tabulation of Quantities

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • Packaging Materials and Containers for Retail Sale Packaging materials and containers in which a good is packaged for retail sale shall, if classified with the good, be disregarded in determining whether all the non-originating materials used in the production of the good undergo the applicable change in tariff classification set out in Annex 4, and, if the good is subject to a regional value-content requirement, the value of such packaging materials and containers shall be taken into account as originating or non-originating materials, as the case may be, in calculating the regional value content of the good.

  • Product Specifications The Company agrees that all Products sold to Xxxx hereunder shall conform to the respective specifications set forth on Schedule A or to such other specifications as are from time to time agreed upon by the Parties.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!