Technical Requirements for Substations Sample Clauses

Technical Requirements for Substations. The reactors must be supplied with current transformers incorporated in bushings, two 5P20 protection cores, in the three phases and neutral terminal, in addition to the corresponding core for thermal image protection. The reactance, power and definitive characteristics of the equipment shall be determined by the Concessionaire in accordance with what is defined, substantiated and approved in the Preoperative Study.
AutoNDA by SimpleDocs
Technical Requirements for Substations. It should be underlined that throughout the development of the definitive study of the Project, the Concessionaire should carry out all studies that guarantee the equipment correct operation in the proposed system.
Technical Requirements for Substations. The reactors must be supplied with current transformers incorporated in bushings, two 5P20 protection cores, in the three phases and neutral terminal, in addition to the corresponding core for thermal image protection. The Concessionaire, in accordance with what is defined, substantiated and approved in the Preoperative Study, shall determine the reactance, power and final characteristics of the equipment. The autotransformer loss levels must be guaranteed for 100%, 75% and 50% of permanent load levels of rated power. The value of losses in reactors operating at rated voltage must also be guaranteed. The guaranteed values shall comply with provisions in IEC 60076 or its ANSI / IEEE equivalent.
Technical Requirements for Substations. The autotransformers must be supplied with current transformers incorporated in bushings, three-core protection 5P20, for the three phases, and three windings, in addition to the corresponding cores for regulation and thermal image protection. The rated voltage, voltage regulation and connection group of the autotransformer bank shall be as follows:  Voltages - Primary voltage 500 kV - Secondary voltage 220 kV - Tertiary voltage (*) (*) kV  Connection group YN / YN / d(Δ) - Primary Side, 500 kV Wye, solidly grounded neutral - Secondary Side, 220 kV Wye, solidly grounded neutral - Tertiary Side, (*) kV Delta (∆) - Voltage Regulation Loaded on the 220 kV side  Rated power - Three-phase banks (500/220) kV 600(*) / 750 MVA (ONAN/ONAF) - Single-phase unit (500:√3/220:√3) kV 200(*) / 250 MVA (ONAN/ONAF) (*) These values will be evaluated and proposed by the Concessionaire in the Pre-Operative Study for evaluation and approval by COES-SINAC. As a reference, a regulation under load is recommended of ± 10% on the 220 kV side, with 1% steps. However, the Concessionaire must define rated voltages, number and range of tap variations and transformer drive and control mechanisms, in accordance with what is defined, substantiated and approved in the Pre-Operative Study.
Technical Requirements for Substations. “Año del Buen Servicio al Ciudadano”

Related to Technical Requirements for Substations

  • Additional Requirements for Sleeping Rooms The Contractor shall provide departing Attendees a secured area for storing belongings.

  • Technical Requirements 4.5.3.1 Tandem Switching shall have the same capabilities or equivalent capabilities as those described in Telcordia TR-TSY-000540 Issue 2R2, Tandem Supplement, June 1, 1990. The requirements for Tandem Switching include but are not limited to the following: 4.5.3.1.1 Tandem Switching shall provide signaling to establish a tandem connection; 4.5.3.1.2 Tandem Switching will provide screening as jointly agreed to by <<customer_short_name>> and BellSouth; 4.5.3.1.3 Where applicable, Tandem Switching shall provide AIN triggers supporting AIN features where such routing is not available from the originating end office switch, to the extent such Tandem switch has such capability; 4.5.3.1.4 Where applicable, Tandem Switching shall provide access to Toll Free number database; 4.5.3.1.5 Tandem Switching shall provide connectivity to Public Safety Answering Point (PSAP)s where 911 solutions are deployed and the tandem is used for 911; and 4.5.3.1.6 Where appropriate, Tandem Switching shall provide connectivity for the purpose of routing transit traffic to and from other carriers. 4.5.3.2 BellSouth may perform testing and fault isolation on the underlying switch that is providing Tandem Switching. Such testing shall be testing routinely performed by BellSouth. The results and reports of the testing shall be made available to <<customer_short_name>>. 4.5.3.3 BellSouth shall control congestion points and network abnormalities. All traffic will be restricted in a non-discriminatory manner. 4.5.3.4 Tandem Switching shall process originating toll free traffic received from <<customer_short_name>>’s local switch. 4.5.3.5 In support of AIN triggers and features, Tandem Switching shall provide SSP capabilities when these capabilities are not available from the Local Switching Network Element to the extent such Tandem Switch has such capability.

  • Solicitations for Subcontracts, Including Procurements of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the Engineer for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Engineer of the Engineer's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.

  • Solicitations for Subcontracts, Including Procurement of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the Local Government for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential subcontractor or supplier will be notified by the Local Government of the Local Government’s obligations under this Agreement and the Acts and Regulations relative to Nondiscrimination on the grounds of race, color, or national origin.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Disbursements for Site Improvements All payments made by the OPWC for site improvements or other work shall be made directly to the Contractor that performed the work and originated the invoice, unless the request is for disbursement to the Recipient.

  • PUBLIC RECORDS COMPLIANCE (APPLICABLE FOR SERVICE CONTRACTS Orange County is a public agency subject to Chapter 119, Florida Statutes. The Contractor agrees to comply with Florida’s Public Records Law. Specifically, the Contractor shall: 1. Keep and maintain public records required by Orange County to perform the service. 2. Upon request from Orange County’s custodian of public records, provide Orange County with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law. 3. Ensure that public records that are exempt or confidential and exempt from the public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to Orange County. 4. Upon completion of the contract, Contractor agrees to transfer at no cost to Orange County all public records in possession of the Contractor or keep and maintain public records required by Orange County to perform the service. If the Contractor transfers all public record to Orange County upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to Orange County, upon request from Orange County’s custodian of public records, in a format that is compatible with the information technology systems of Orange County. 5. A Contractor who fails to provide the public records to Orange County within a reasonable time may be subject to penalties under section 119.10, Florida Statutes. 6. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT : Procurement Public Records Liaison

  • Packing Materials and Containers for Shipment Packing materials and containers in which the good is packed for shipment shall be disregarded in determining whether-- (i) the non-originating materials used in the production of the good undergo an applicable change in tariff classification set out in subdivision (t) of this note; and (ii) the good satisfies a regional value-content requirement.

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.