Temporary Agency Workers provided in response to Sample Clauses

Temporary Agency Workers provided in response to a request shall meet any Departmental or Service specific standards of the Customer. The Managed Service Provider will be responsible for ensuring they and all Agencies provide such details to the Temporary Agency Worker in advance of their assignment. Details of these will be made available to the Managed Service Provider at the implementation stage although the Customer may update these standard requirements from time to time in line with, for example, changes to legislation, addition of new services, re-structuring of the Customer organisation, unfilled requests for Temporary Agency Workers. The Contract Manager shall communicate such changes to the Managed Service Provider.
AutoNDA by SimpleDocs

Related to Temporary Agency Workers provided in response to

  • Compliance with Consensus Policies and Temporary Policies Registry Operator shall comply with and implement all Consensus Policies and Temporary Policies found at <xxxx://xxx.xxxxx.xxx/general/consensus-­‐policies.htm>, as of the Effective Date and as may in the future be developed and adopted in accordance with the ICANN Bylaws, provided such future Consensus Polices and Temporary Policies are adopted in accordance with the procedure and relate to those topics and subject to those limitations set forth in Specification 1 attached hereto (“Specification 1”).

  • Temporary Layoff The Employer may temporarily layoff an employee for up to ninety (90) days due to an unanticipated loss of funding, revenue shortfall, lack of work, shortage of material or equipment, or other unexpected or unusual reasons. An employee will normally receive seven (7) days notice of a temporary layoff.

  • Optional Xactimate Response Attachment (Part 2)

  • Timely and Sustained Response Interconnection Customer shall ensure that the Small Generating Facility’s real power response to sustained frequency deviations outside of the deadband setting is automatically provided and shall begin immediately after frequency deviates outside of the deadband, and to the extent the Small Generating Facility has operating capability in the direction needed to correct the frequency deviation. Interconnection Customer shall not block or otherwise inhibit the ability of the governor or equivalent controls to respond and shall ensure that the response is not inhibited, except under certain operational constraints including, but not limited to, ambient temperature limitations, physical energy limitations, outages of mechanical equipment, or regulatory requirements. The Small Generating Facility shall sustain the real power response at least until system frequency returns to a value within the deadband setting of the governor or equivalent controls. An Applicable Reliability Standard with equivalent or more stringent requirements shall supersede the above requirements.

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Temporary Layoffs A. The Employer may initiate a temporary layoff for up to twelve (12) working days per fiscal year. Employees will be given thirty (30) days’ notice before the effective date of a temporary layoff. Employees may request alternative temporary layoff days from their manager or supervisor and any requests will be considered and approved or denied in writing.

  • Temporary Policies Registry Operator shall comply with and implement all specifications or policies established by the Board on a temporary basis, if adopted by the Board by a vote of at least two-­‐thirds of its members, so long as the Board reasonably determines that such modifications or amendments are justified and that immediate temporary establishment of a specification or policy on the subject is necessary to maintain the stability or security of Registry Services or the DNS (“Temporary Policies”).

  • PERFORMING AGENCY RESPONSIBILITY FOR SYSTEM AGENCY’S TERMINATION COSTS If the System Agency terminates the Contract for cause, the Performing Agency shall be responsible to the System Agency for all costs incurred by the System Agency and the State of Texas to replace the Performing Agency. These costs include, but are not limited to, the costs of procuring a substitute vendor and the cost of any claim or litigation attributable to Performing Agency’s failure to perform any Work in accordance with the terms of the Contract.

  • Lobbying Activities - Standard Form - LLL No response Do not upload this form unless Vendor has reportable lobbying activities. There are Attributes entitled, “2 CFR Part 200 or Federal Provision - Xxxx Anti-Lobbying Amendment – Continued.” Properly respond to those Attributes and only upload this form if applicable/instructed. If upload is required based on your response to those Attributes, the Disclosure of Lobbying Activities – Standard Form - LLL must be downloaded from the “Attachments” section of the IonWave eBid System, reviewed, properly completed, and uploaded to this location.

  • Government’s Response Please refer to the Q&A from the first question.

Time is Money Join Law Insider Premium to draft better contracts faster.